22:32 31 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4161-4180
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Henan Yanshi Biomass Power generation Project | Henan Hexie Shanye Industry Co., Ltd | China | 28 Dec 2011 |
Green Energy biomass based steam generation Dutch Lady Ha Nam | Green Energy Investment Production Joint Stock Company | Viet Nam | 28 Dec 2011 |
850 Kw, Grid Connected Wind Farm Project By Kpr Mill Limited, Tamilnadu India | KPR Mill Limited | India | 28 Dec 2011 |
Green Energy biomass based steam generation Vinamilk Tien Son | Green Energy Investment Production Joint Stock Company | Viet Nam | 28 Dec 2011 |
0.60 MW Grid Connected WInd Power Project of M/s New Pashchim Maharashtra Patra depot | M/s New Pashchim Maharashtra Patra depot | India | 28 Dec 2011 |
Bioenergia Gases Recovery and Combustion in a Carbonization Plant | Saint Gobain Pam Bioenergia Ltda. | Brazil | 28 Dec 2011 |
Datang New Energy Chayouhouqi Hanwula Wind Farm Project | Datang New Energy (Chayouhouqi) Co., Ltd | China | 28 Dec 2011 |
5 MW Biomass Gasification based power project by FEPL | Future Energy (Pvt) Ltd | Sri Lanka | 28 Dec 2011 |
Primary Heating Network of Datang Weihe Power Plant (2×300MW) Cogeneration Retrofit Project | Datang Shaanxi Power Generation Co., Ltd | China | 28 Dec 2011 |
Bundled wind power project in India | Hyderabad Industries Limited | India | 28 Dec 2011 |
Flare gas recovery project at Ras Al Khaimah, UAE | RAK Gas L.L.C | United Arab Emirates | 28 Dec 2011 |
0.60 MW Grid Connected Wind Power Project of Mr Babasaheb B.. G unjate | Mr Bababsaheb B. Gunjate | India | 28 Dec 2011 |
CECEP Tulufan Shanshan 1st Stage 20MWp PV Power Project | CECEP Solar Power Generation Shanshan Co., Ltd | China | 27 Dec 2011 |
Zhejiang Tantoushan Wind Farm Project | Zhejiang Donghai Dejia Wind Power Co., Ltd | China | 27 Dec 2011 |
Força Wind Power Plant Project (FWPPP) | Enerfin Do Brasil Sociedade De Energia LTDA. | Brazil | 27 Dec 2011 |
Jiangyin Harbor International Logistic Co., Ltd. Warehouse Roof 2MWp PV Power Project | CECEP Solar Power Generation Jiangyin Co., Ltd | China | 27 Dec 2011 |
CECEP Dongtai Solar Power Generation Co., Ltd. 2nd Stage 30MWp PV Tidal Flat Ground Power Project | CECEP Dongtai Solar Power Generation Co., Ltd | China | 27 Dec 2011 |
CECEP Dongtai Solar Power Generation Co., Ltd. 1st Stage 30MWp PV Tidal Flat Ground Power Project | CECEP Dongtai Solar Power Generation Co., Ltd | China | 27 Dec 2011 |
Gansu Yumen Sanshilijingzi South 32.5MW Large-scale Wind Turbine Shifan Wind Farm Project | Gansu Jieyuan Wind Power Co., Ltd | China | 27 Dec 2011 |
CECEP Wuzhong Taiyangshan PV Power Generation Co., Ltd. Taiyangshan 3rd Stage 50 MWp PV Power Project | CECEP Wuzhong Taiyangshan PV Power Generation Co Ltd | China | 27 Dec 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: