03:26 06 Nov 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
161-180
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Small Hydroelectric Power Plant (PCH) Beira Rio | Pesqueiro Energia S/A | Brazil | 15 Jul 2021 |
Projeto Complexo Eolico Cajuina Norte | VENTOS DE SANTA TEREZA 01 ENERGIAS RENOVAVEIS S.A | Brazil | 13 Jul 2021 |
150 MW Solar Photo Voltaic Project at Chhatargarh (Rajasthan) | NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Limited | India | 09 Jul 2021 |
320 MW Solar Photo Voltaic Project at Bhainsara (Rajasthan) | NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Limited | India | 09 Jul 2021 |
300 MW Thar Solar Project in Rajasthan | Thar Surya 1 Private Limited | India | 08 Jul 2021 |
285 MW Coral Wind project in Gujarat | Avikiran Solar India Private Limited | India | 08 Jul 2021 |
Smart Luz – Public Lighting Energy Efficiency Program | Ecosecurities do Brasil Ltda. | Brazil | 07 Jul 2021 |
90 MW Solar Photo Voltaic Project at Anta (Rajasthan) | NTPC Limited, India | India | 29 Jun 2021 |
Programmatic CDM for Improvement in waste management and disposal of municipal and industrial solid waste through the Recovery and Recycling In Chile | Fundacion Acongagua Region Sustenable | Chile | 12 Jun 2021 |
Tati Solar Project | Shumba Energy (Pty) Ltd | Botswana | 10 Jun 2021 |
Dibwangui Hydroelectric Dam Project | Louetsy Energy | Gabon | 09 Jun 2021 |
Ngoulmenjim Hydroelectric Dam Project | Asokh Energy | Gabon | 09 Jun 2021 |
Upper Trishuli -1 Hydroelectric Project (216 MW) | Nepal Water and Energy Development Company Private Limited | Nepal | 04 Jun 2021 |
Biomass Gasification | Klabin S.A | Brazil | 01 Jun 2021 |
Biomass Boiler | Klabin S.A | Brazil | 01 Jun 2021 |
Programmatic CDM for gas capture from closing landfills, recycling, treatment and biomethanation of solid wastes (municipal and industrial), from the formal Sector in Chile | Fundacion Aconcagua Region Sustentable | Chile | 26 May 2021 |
15 MW Ground Mounted Solar Power Plant at ONGC Ltd. Vagra, Gujarat | ONGC Ltd. | India | 24 May 2021 |
Guadalupe and La rosa de Sharon bundle small Solar PV Project | Korea Hydro & Nuclear Power Co., Ltd. | Chile | 18 May 2021 |
CS Solar Power Project in Vietnam | CS Wind Vietnam Co. Ltd. | Viet Nam | 13 May 2021 |
CS Bearing Vietnam Factor Roof Top Solar System | CS Bearing Vietnam Co. Ltd. | Viet Nam | 13 May 2021 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: