Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 7 | 8 | 9 | 10 | 11 | ... 669 >>
Displaying 161-180 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Small Hydroelectric Power Plant (PCH) Beira Rio Pesqueiro Energia S/A Brazil 15 Jul 2021
Projeto Complexo Eolico Cajuina Norte VENTOS DE SANTA TEREZA 01 ENERGIAS RENOVAVEIS S.A Brazil 13 Jul 2021
150 MW Solar Photo Voltaic Project at Chhatargarh (Rajasthan) NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Limited India 09 Jul 2021
320 MW Solar Photo Voltaic Project at Bhainsara (Rajasthan) NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Limited India 09 Jul 2021
300 MW Thar Solar Project in Rajasthan Thar Surya 1 Private Limited India 08 Jul 2021
285 MW Coral Wind project in Gujarat Avikiran Solar India Private Limited India 08 Jul 2021
Smart Luz – Public Lighting Energy Efficiency Program Ecosecurities do Brasil Ltda. Brazil 07 Jul 2021
90 MW Solar Photo Voltaic Project at Anta (Rajasthan) NTPC Limited, India India 29 Jun 2021
Programmatic CDM for Improvement in waste management and disposal of municipal and industrial solid waste through the Recovery and Recycling In Chile Fundacion Acongagua Region Sustenable Chile 12 Jun 2021
Tati Solar Project Shumba Energy (Pty) Ltd Botswana 10 Jun 2021
Dibwangui Hydroelectric Dam Project Louetsy Energy Gabon 09 Jun 2021
Ngoulmenjim Hydroelectric Dam Project Asokh Energy Gabon 09 Jun 2021
Upper Trishuli -1 Hydroelectric Project (216 MW) Nepal Water and Energy Development Company Private Limited Nepal 04 Jun 2021
Biomass Gasification Klabin S.A Brazil 01 Jun 2021
Biomass Boiler Klabin S.A Brazil 01 Jun 2021
Programmatic CDM for gas capture from closing landfills, recycling, treatment and biomethanation of solid wastes (municipal and industrial), from the formal Sector in Chile Fundacion Aconcagua Region Sustentable Chile 26 May 2021
15 MW Ground Mounted Solar Power Plant at ONGC Ltd. Vagra, Gujarat ONGC Ltd. India 24 May 2021
Guadalupe and La rosa de Sharon bundle small Solar PV Project Korea Hydro & Nuclear Power Co., Ltd. Chile 18 May 2021
CS Solar Power Project in Vietnam CS Wind Vietnam Co. Ltd. Viet Nam 13 May 2021
CS Bearing Vietnam Factor Roof Top Solar System CS Bearing Vietnam Co. Ltd. Viet Nam 13 May 2021