Project: 2697 Siam Cement (Kaeng Khoi) Waste Heat Power Generation Project, Thailand (KK6 Project) - History
Project 2697: Siam Cement (Kaeng Khoi) Waste Heat Power Generation Project, Thailand (KK6 Project)
Request for review Request 1
Request 2
Request 3


EB meeting: EB51
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Joint Response (415 KB)
Enclosure (101 KB)
Enclosure 1 (344 KB)
Enclosure 2 (119 KB)
Enclosure 3 (112 KB)
Enclosure 4 (112 KB)
Enclosure 5 (111 KB)
Enclosure 6 (61 KB)
Enclosure 7 (265 KB)
Enclosure 8 (19 KB)
Enclosure 9 (186 KB)
Enclosure 10 (2031 KB)
Enclosure 11 (535 KB)
Enclosure 12 (1986 KB)
Enclosure 13 (120 KB)
Enclosure 14 (108 KB)
Enclosure 15 (193 KB)
Enclosure 16 (73 KB)
Enclosure 17 (636 KB)
Enclosure 18 (27 KB)
Enclosure 19 (14 KB)
Enclosure 20 (205 KB)
Enclosure 21 (215 KB)
Enclosure 22 (73 KB)
Enclosure 23 (136 KB)
Enclosure 24 (115 KB)
Enclosure 25 (14 KB)
Enclosure 26 (1457 KB)
Enclosure 27 (350 KB)
Enclosure 28 (158 KB)
Enclosure 29 (27 KB)
Enclosure 30 (39 KB)
Review Scope (134 KB)

EB meeting: EB52
(at which the report of the review team was/will be considered)

Data before corrections

Amount of Reductions 29,342 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (933 KB)


PDD appendices
Appendix 1 - Enclosure (30 KB)
Appendix 2 - Enclosure 1 (83 KB)
Appendix 3 - Enclosure 2 (192 KB)
Appendix 4 - Enclosure 3 (3222 KB)
Validation Report Validation report (404 KB)