18:38 15 Feb 26
Project
2697 :
Siam Cement (Kaeng Khoi) Waste Heat Power Generation Project, Thailand (KK6 Project)
| Project title |
Siam Cement (Kaeng Khoi) Waste Heat Power Generation Project, Thailand (KK6 Project)
- project design document (1058 KB)
PDD appendices Appendix 1 - Enclosure (30 KB)
Appendix 2 - Enclosure 1 (83 KB)
Appendix 3 - Enclosure 2 (192 KB)
Appendix 4 - Enclosure 3 (3222 KB)
Appendix 5 - Enclosure 4 (119 KB)
- registration request form (235 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Thailand
, involved indirectly
approval (47 KB)
authorization (47 KB)
Authorized Participants: Cementhai Energy Conservation Co., Ltd. |
| Other Parties Involved | n/a |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
| Activity Scale | LARGE |
| Methodologies Used |
AM0024 ver. 2 -
Baseline methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants
|
| Standardized baselines used | N/A |
| Amount of Reductions | 29,354 metric tonnes CO2 equivalent per annum |
| Fee level | USD 4370.8 |
| Validation Report |
Validation report (2066 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
Modalities of Communication valid as of 15/06/2012 |
| Registration Date | 12 Apr 10 (view history) |
| Crediting Period | 12 Apr 10 - 11 Apr 20 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 3 - Enclosure 2
Appendix 4 - Enclosure 3
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: