Project: 1668 Baotou Iron & Steel Coke Dry Quenching #3 and Waste Heat Utilization for Electricity Generation Project - History
Project 1668: Baotou Iron & Steel Coke Dry Quenching #3 and Waste Heat Utilization for Electricity Generation Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB42
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE/PP Initial comments (283 KB)
Annexure 1_tariff regulation for western Inner Mongolia 2005 (94 KB)
Annexure 2_Net Electricity Generation Record for 1-2# CDQ BISCO (24 KB)
Annexure 3_Official Communication with design institute (210 KB)
Annexure 4_SenAnalysis-BaotouCDQ (189 KB)
Annexure 5_Design Institute opinion on CDQ barrier (1591 KB)
Annexure 6_common practice analysis_scanned (502 KB)
Annexure 7_Investment cost-Ma steel CDQ _2 (140 KB)
Annexure 8_Revised PDD - Tracked changes (948 KB)
Review Scope (99 KB)

EB meeting: EB43
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (946 KB)


PDD appendices
Appendix 1 - Enclosure 1 (1591 KB)
Appendix 2 - Enclosure 2 (285 KB)
Appendix 3 - Enclosure 3 (938 KB)
Appendix 4 - Enclosure 4 (942 KB)
Appendix 5 - Enclosure 5 (147 KB)
Appendix 6 - Enclosure 6 (30 KB)
Validation Report Validation report (334 KB)