Project: 0557 Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Pakarab Fertilizer Ltd (PVT) in Multan, Pakistan - Issuance Request
Project 0557: Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Pakarab Fertilizer Ltd (PVT) in Multan, Pakistan
 
ISSUANCE STATUS Issued (on 29 Dec 08)  
Monitoring period 01 Apr 08 - 31 Jul 08
Monitoring report Monitoring report (413 KB)
 
Request for issuance Signed form (667 KB)

Before corrections:
Signed form (667 KB)
Amount of CERs CERs issued up to 31 December 2012: 392,606
Serial Range: Block start: PK-5-295205-1-1-0-557     Block end: PK-5-687810-1-1-0-557


Before corrections:
392606
Verification and certification reports Certification report (277 KB)
Verification report (277 KB)

Before corrections:
Certification report (291 KB)
Verification report (291 KB)
Additional documents Logging data (255 KB)
0557 monitoring report 4 (434 KB)

Before corrections:
Logging data (255 KB)
Monitoring Report N4 (436 KB)
Request for review Request 1
Request 2
Request 3


EB meeting: EB43
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE - Initial comments (33 KB)
Verification Report (271 KB)
Attachment 1 A Log Sheet A 15062008 (701 KB)
Attachment 1_B_Log Sheet B 15062008 (679 KB)
Attachment 1_C_Log Sheet C 15062008 (896 KB)
Attachment 2_A_Calibration Record Temp Line A 14092007 (40 KB)
Attachment 2_B_Calibration Record Temp Line B 17092007 (40 KB)
Attachment 2_C_Calibration Record Temp Line C 27082007 (40 KB)
Attachment 3_A_Calibration Record Nitric Acid Line A 20012008 (43 KB)
Attachment 3_B_Calibration Record Nitric Acid Line B 18012008 (43 KB)
Attachment 3_C_Calibration Record Nitric Acid LIne C 18012008 (42 KB)
Attachment 4_Calibration Record HC and NH3 ABC (5045 KB)