06:08 24 Nov 24
Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Pakarab Fertilizer Ltd (PVT) in Multan, Pakistan (0557) |
---|---|
DOE that requested for issuance and date of request | DNV (10 Sep 08) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1. The applied methodology and the revised monitoring plan require that the baseline emissions are limited to the design capacity of the existing nitric acid plant, which is 600 t/day for Line A and B. However, the nitric acid production of Line A and B have exceeded the plant capacity for 9 days and 26, days respectively. Clarification is required on how the DOE verified that this requirement had been met. 2. The revised monitoring plan and the methodology require that the plant output of nitric acid is regularly checked with the acid density and concentration during the project lifetime. Further clarification is required on how the DOE verified the plant output of nitric acid. 3. The DOE verified the calibration of the measuring equipment in details except the flow meters for ammonia input to SCR De-NOx facility and hydrocarbon input for tail gas reheating. Further clarification is required. |
|
Date | 28 Sep 08 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: