15:28 05 Oct 24
Project:
5100 Boxing Biogas Recovery and Utilization Project in Shandong Province
- History
Project | 5100: Boxing Biogas Recovery and Utilization Project in Shandong Province |
---|---|
Request for review |
Request 1
Request 2 Request 3 EB meeting: EB66 (at which the review were/will be considered) |
Review documentation | |
Clarification documents |
DOE response to request for review (156 KB)
|
Data before review
Amount of Reductions | 56,819 metric tonnes CO2 equivalent per annum |
---|---|
CDM-PDD |
project design document (1382 KB)
PDD appendices Appendix 1 - CDM Consideration_Boxing (343 KB) Appendix 2 - ER_Boxing (69 KB) Appendix 3 - IRR_Boxing (63 KB) Appendix 4 - construction contract_Boxing (235 KB) Appendix 5 - construction permit_Boxing (98 KB) Appendix 6 - equipment contract_Boxing (270 KB) Appendix 7 - installation contract_Boxing (238 KB) |
Validation Report | Validation report (784 KB) |
Data before approval of the request for post-registration changes on 20 Aug 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (914 KB)
PDD appendices Appendix 1 - ER_boxing (57 KB) Appendix 2 - IRR_boxing (63 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: