Project: 5100 Boxing Biogas Recovery and Utilization Project in Shandong Province - History
Project 5100: Boxing Biogas Recovery and Utilization Project in Shandong Province
Request for review Request 1
Request 2
Request 3


EB meeting: EB66
(at which the review were/will be considered)
Review documentation
Clarification documents DOE response to request for review (156 KB)


Data before review

Amount of Reductions 56,819 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (1382 KB)

PDD appendices
Appendix 1 - CDM Consideration_Boxing (343 KB)
Appendix 2 - ER_Boxing (69 KB)
Appendix 3 - IRR_Boxing (63 KB)
Appendix 4 - construction contract_Boxing (235 KB)
Appendix 5 - construction permit_Boxing (98 KB)
Appendix 6 - equipment contract_Boxing (270 KB)
Appendix 7 - installation contract_Boxing (238 KB)
Validation Report Validation report (784 KB)

Data before approval of the request for post-registration changes on 20 Aug 2013

Link to PRC form PRC
CDM-PDD project design document (914 KB)


PDD appendices
Appendix 1 - ER_boxing (57 KB)
Appendix 2 - IRR_boxing (63 KB)