Project: 5100 Boxing Biogas Recovery and Utilization Project in Shandong Province - Request for post-registration changes
Project 5100 Boxing Biogas Recovery and Utilization Project in Shandong Province
PRC ref PRC-5100-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 22 Dec 11 - 21 Dec 21
Assessment opinion Assessment opinion (1779 KB)
Revised PDD Revised PDD (1906 KB)   Revised PDD - track changes (1909 KB)
Supplementary documents Appendix 1 - Registered PDD-Boxing ver.08(the registered PDD updated using the form for the VVS track).pdf (1897 KB)
Signed form Signed form (91 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Aug 13 - Approved
Effective approval date: 20 Aug 13
Historic statuses 22 Jul 13 - Request published