15:29 05 Oct 24
Project:
5100 Boxing Biogas Recovery and Utilization Project in Shandong Province
- Request for post-registration changes
Project | 5100 Boxing Biogas Recovery and Utilization Project in Shandong Province |
---|---|
PRC ref | PRC-5100-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 22 Dec 11 - 21 Dec 21 |
Assessment opinion | Assessment opinion (1779 KB) |
Revised PDD | Revised PDD (1906 KB) Revised PDD - track changes (1909 KB) |
Supplementary documents |
Appendix 1 - Registered PDD-Boxing ver.08(the registered PDD updated using the form for the VVS track).pdf (1897 KB)
|
Signed form | Signed form (91 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 20 Aug 13 -
Approved
Effective approval date: 20 Aug 13
|
Historic statuses |
22 Jul 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: