13:31 08 Nov 25
Project:
5100 Boxing Biogas Recovery and Utilization Project in Shandong Province
- Request for post-registration changes
| Project | 5100 Boxing Biogas Recovery and Utilization Project in Shandong Province |
|---|---|
| PRC ref | PRC-5100-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 22 Dec 11 - 21 Dec 21 |
| Assessment opinion |
Assessment opinion (1779 KB)
|
| Revised PDD |
Revised PDD (1906 KB)
Revised PDD - track changes (1909 KB)
|
| Supplementary documents |
Appendix 1 - Registered PDD-Boxing ver.08(the registered PDD updated using the form for the VVS track).pdf (1897 KB)
|
| Signed form |
Signed form (91 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 20 Aug 13 -
Approved
Effective approval date: 20 Aug 13
|
| Historic statuses |
22 Jul 13 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: