Project: 9550 Mwenga Hydro Power Project - History
Project 9550: Mwenga Hydro Power Project

Data before approval of the request for post-registration changes on 25 Jul 2019

Link to PRC form PRC
CDM-PDD project design document (1305 KB)
Validation opinion on changes in PDD Validation opinion on changes in PDD (630 KB)

Data before approval of the request for post-registration changes on 21 Oct 2015

Link to PRC form PRC
CDM-PDD project design document (4069 KB)


PDD appendices
Appendix 1 - CM_2006_2012_Mwenga 03.05.2011 (14 MB)