Project: 9550 Mwenga Hydro Power Project - Request for post-registration changes
Project 9550 Mwenga Hydro Power Project
PRC ref PRC-9550-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 30 Jan 2013 - 29 Jan 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 30 Jan 13 - 29 Jan 20
Assessment opinion Assessment opinion (630 KB)
Revised PDD Revised PDD (1305 KB)   Revised PDD - track changes (1391 KB)
Supplementary documents Appendix 1 - Upload Information for Documents.pdf (15 KB)
Signed form Signed form (55 KB)
DOE clarification
VVS version VVS 7.0
Current status 21 Oct 15 - Approved
Effective approval date: 21 Oct 15
Historic statuses 22 Sep 15 - Request published