Project: 9550 Mwenga Hydro Power Project - Request for post-registration changes
Project 9550 Mwenga Hydro Power Project
PRC ref PRC-9550-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 30 Jan 13 - 29 Jan 20
Assessment opinion Assessment opinion (524 KB)
Revised PDD Revised PDD (4529 KB)   Revised PDD - track changes (2000 KB)
Supplementary documents
Signed form Signed form (174 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 25 Jul 19 - Approved
Effective approval date: 25 Jul 19