Project:
9550 Mwenga Hydro Power Project
- Request for post-registration changes
| Project | 9550 Mwenga Hydro Power Project |
|---|---|
| PRC ref | PRC-9550-002 |
| Process track | Issuance |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 30 Jan 13 - 29 Jan 20 |
| Assessment opinion |
Assessment opinion (524 KB)
|
| Revised PDD |
Revised PDD (4529 KB)
Revised PDD - track changes (2000 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (174 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 25 Jul 19 -
Approved
Effective approval date: 25 Jul 19
|
| Historic statuses |
26 Jun 19 -
Request published |

Assessment opinion