09:43 25 Jan 25
Project:
3601 Sichuan Jialingjiang River Fengyi Hydropower Project
- History
Project | 3601: Sichuan Jialingjiang River Fengyi Hydropower Project |
---|---|
Request for review |
Request 1
Request 2 Request 3 |
Review documentation | |
Clarification documents |
Reference List (24 KB)
R1: R-PDR (429 KB) R2:PDD uploaded last time for reference (445 KB) R3:Purchase Contract of Turbine/Generator (361 KB) R4:Excel sheet for IRR calculation with reduced cost of Turbine/Generator (997 KB) DOE's Response for Request for Review (100 KB) |
Data before review
CDM-PDD |
project design document (2491 KB)
PDD appendices Appendix 1 - IRR Spreadsheet (997 KB) |
---|---|
Validation Report | Validation report (1963 KB) |
Data before approval of the request for post-registration changes on 03 May 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (1856 KB)
|
Validation opinion on changes in PDD | Validation opinion on changes in PDD (58 KB) |
Data before approval of the request for post-registration changes on 12 Apr 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (1245 KB)
PDD appendices Appendix 1 - Annex #1 The notificaiton about the revetment from the provincial department.pdf (579 KB) Appendix 2 - Annex #2. Flood from 20100723 to 20100727.pdf (115 KB) Appendix 3 - Annex #3. 2010 rainfall amount of Nanchong City.pdf (222 KB) Appendix 4 - Annex #4. 72 hours testing operation record_issued by Sichuan power grid.pdf (685 KB) Appendix 5 - Annex #7. Acceptance document of No.1 dam-gate structure.pdf (114 KB) |
Validation opinion on changes in PDD | Validation opinion on changes in PDD (270 KB) |
Data before approval of the request for post-registration changes on 26 Dec 2012
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (1721 KB)
PDD appendices Appendix 1 - IRR Spreadsheet (997 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: