Project: 3601 Sichuan Jialingjiang River Fengyi Hydropower Project - History
Project 3601: Sichuan Jialingjiang River Fengyi Hydropower Project
Request for review Request 1
Request 2
Request 3
Review documentation
Clarification documents Reference List (24 KB)
R1: R-PDR (429 KB)
R2:PDD uploaded last time for reference (445 KB)
R3:Purchase Contract of Turbine/Generator (361 KB)
R4:Excel sheet for IRR calculation with reduced cost of Turbine/Generator (997 KB)
DOE's Response for Request for Review (100 KB)


Data before review

CDM-PDD project design document (2491 KB)

PDD appendices
Appendix 1 - IRR Spreadsheet (997 KB)
Validation Report Validation report (1963 KB)

Data before approval of the request for post-registration changes on 03 May 2013

Link to PRC form PRC
CDM-PDD project design document (1856 KB)
Validation opinion on changes in PDD Validation opinion on changes in PDD (58 KB)

Data before approval of the request for post-registration changes on 12 Apr 2013

Link to PRC form PRC
CDM-PDD project design document (1245 KB)


PDD appendices
Appendix 1 - Annex #1 The notificaiton about the revetment from the provincial department.pdf (579 KB)
Appendix 2 - Annex #2. Flood from 20100723 to 20100727.pdf (115 KB)
Appendix 3 - Annex #3. 2010 rainfall amount of Nanchong City.pdf (222 KB)
Appendix 4 - Annex #4. 72 hours testing operation record_issued by Sichuan power grid.pdf (685 KB)
Appendix 5 - Annex #7. Acceptance document of No.1 dam-gate structure.pdf (114 KB)

Validation opinion on changes in PDD Validation opinion on changes in PDD (270 KB)

Data before approval of the request for post-registration changes on 26 Dec 2012

Link to PRC form PRC
CDM-PDD project design document (1721 KB)


PDD appendices
Appendix 1 - IRR Spreadsheet (997 KB)