Project: 3601 Sichuan Jialingjiang River Fengyi Hydropower Project - Request for post-registration changes
Project 3601 Sichuan Jialingjiang River Fengyi Hydropower Project
PRC ref PRC-3601-002
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 15 Jan 12 - 14 Jan 19
Assessment opinion Assessment opinion (58 KB)
Revised PDD Revised PDD (1856 KB)   Revised PDD - track changes (1592 KB)
Supplementary documents Appendix 1 - Annex #1. The specification of Generator.pdf (700 KB)
Appendix 2 - Annex #2. The specification of Turbine.pdf (2133 KB)
Appendix 3 - Annex #3. Calibration before installation of Generator meter.pdf (1401 KB)
Signed form Signed form (425 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Apr 13 - Approved
Effective approval date: 12 Apr 13
Historic statuses 14 Mar 13 - Request published