19:23 09 Jan 25
Project:
3601 Sichuan Jialingjiang River Fengyi Hydropower Project
- Request for post-registration changes
Project | 3601 Sichuan Jialingjiang River Fengyi Hydropower Project |
---|---|
PRC ref | PRC-3601-001 |
Process track | Prior approval |
DOE | DTSUS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Change to the start date of the crediting period
|
Applicable crediting period | 15 Jan 12 - 14 Jan 19 |
Assessment opinion | Assessment opinion (270 KB) |
Revised PDD | Revised PDD (1245 KB) Revised PDD - track changes (1296 KB) |
Supplementary documents |
Appendix 1 - Annex #1 The notificaiton about the revetment from the provincial department.pdf (579 KB)
Appendix 2 - Annex #2. Flood from 20100723 to 20100727.pdf (115 KB) Appendix 3 - Annex #3. 2010 rainfall amount of Nanchong City.pdf (222 KB) Appendix 4 - Annex #4. 72 hours testing operation record_issued by Sichuan power grid.pdf (685 KB) Appendix 5 - Annex #7. Acceptance document of No.1 dam-gate structure.pdf (114 KB) Appendix 6 - Annex #5. PPA and annex PPA.pdf (557 KB) Appendix 7 - Annex #6. Electricity division agreement.pdf (129 KB) |
Signed form | Signed form (671 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 26 Dec 12 -
Approved
Effective approval date: 26 Dec 12
|
Historic statuses |
06 Nov 12 -
Published 06 Nov 12 - Summary note being prepared 05 Dec 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform