16:22 18 Jan 25
Project
4226 :
Utilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
Project title |
Utilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
- project design document (700 KB) PDD appendices Appendix 1 - 4226 Baseline Cal (29 KB) Appendix 2 - 4226 ER Sheet (35 KB) Appendix 3 - 4226 Elecricity Consumption (35 KB) Appendix 4 - 4226 Financial Cal (118 KB) - registration request form (191 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
India
, involved indirectly
approval (344 KB)
authorization (344 KB)
Authorized Participants: Birla Corporation Limited |
Other Parties Involved | n/a |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
Activity Scale | LARGE |
Methodologies Used |
AM0024 ver. 2 -
Baseline methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants
|
Standardized baselines used | N/A |
Amount of Reductions | 40,026 metric tonnes CO2 equivalent per annum |
Fee level | USD 6505.2 |
Validation Report |
Validation report (2351 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) |
Crediting Period | 01 Apr 11 - 31 Mar 21 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: