Utilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
[]
Host party(ies) India
Methodology(ies) AM0024 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 39,727
Start date of first crediting period. 01 Apr 10
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 18 Sep 09 - 17 Oct 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (631 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs