19:26 09 Jan 25
Project:
4775 CECIC Taiyangshan Grid-connected Solar PV Power Generation Phase 1 Project
- History
Project | 4775: CECIC Taiyangshan Grid-connected Solar PV Power Generation Phase 1 Project |
---|
Data before approval of the request for post-registration changes on 22 Aug 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (782 KB)
|
Validation opinion on changes in PDD | Validation opinion on changes in PDD (410 KB) |
Data before approval of the request for post-registration changes on 21 Nov 2012
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (648 KB)
PDD appendices Appendix 1 - Calculation1 (95 KB) Appendix 2 - Calculation2 (114 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: