Project: 4775 CECIC Taiyangshan Grid-connected Solar PV Power Generation Phase 1 Project - Request for post-registration changes
Project 4775 CECIC Taiyangshan Grid-connected Solar PV Power Generation Phase 1 Project
PRC ref PRC-4775-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 10 Jun 11 - 09 Jun 18
Assessment opinion Assessment opinion (410 KB)
Revised PDD Revised PDD (782 KB)   Revised PDD - track changes (741 KB)
Supplementary documents
Signed form Signed form (49 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Nov 12 - Approved
Effective approval date: 21 Nov 12
Historic statuses 14 Oct 12 - Published
14 Oct 12 - Summary note being prepared
31 Oct 12 - Awaiting EB decision