09:21 24 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
9701-9720
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Rice Husk Based Cogeneration project in Haryana, India by Goel International Pvt. Ltd | M/s. Goel International Pvt. Ltd | India | 12 May 2010 |
Avoidance of methane from biomass decay by up gradation and capacity enhancement of the existing Municipal Solid Waste (MSW) composting plant in Shillong, Meghalaya | M/s Anderson Biotech Private Limited | India | 12 May 2010 |
Fossil fuel replacement by biomass in the brick manufacturing Industry | ALIENERGY S.A. | Colombia | 11 May 2010 |
Fossil fuel to hydroelectricity switch at N'Zoro | Office des Mines d'Or de Kilo-Moto | Democratic Republic of the Congo | 11 May 2010 |
Fossil fuel to hydroelectricity switch at Lubilanji 2 | Minière de Bakwanga | Democratic Republic of the Congo | 11 May 2010 |
fuel switch - plaster board production Dongguan | Knauf Gips KG | China | 11 May 2010 |
Wind Power Plants Seabra, Novo Horizonte and Macaúbas CDM Project | Enerbio Consultoria & Associados Sociedade Simples | Brazil | 11 May 2010 |
Guizhou Jinqiao Coal Mine CMM Utilization Project | Guizhou Pangea Gas Technology Co., Ltd | China | 11 May 2010 |
Fossil fuel to hydroelectricity switch at Lubilanji 1 | Minière de Bakwanga | Democratic Republic of the Congo | 11 May 2010 |
fuel switch - plaster board dryer Tianjin | Knauf Gips KG | China | 11 May 2010 |
Plaine des Roches Wind Farm | AEROWATT MAURITIUS | Mauritius | 11 May 2010 |
Olkaria III 48 MW Geothermal Project - Additional expansion of up to 52 MW | OrPower 4, Inc. | Kenya | 11 May 2010 |
Fossil fuel to hydroelectricity switch at Tshiala | Minière de Bakwanga | Democratic Republic of the Congo | 11 May 2010 |
Shandong Laiwu Landfill Gas Recovery and Power Generation Project | Shandong Micropowers New Energy Co., Ltd. | China | 11 May 2010 |
Fossil fuel to hydroelectricity switch at Budana | Office des Mines d'Or de Kilo-Moto | Democratic Republic of the Congo | 11 May 2010 |
Biomass Based Energy Generation for Kohinoor Mills Ltd. | CDMPAK | Pakistan | 11 May 2010 |
Wind Power Project by M/s Elveety Industries Pvt. Ltd. at Tamil Nadu, India | M/s Elveety Industries Pvt. Ltd. | India | 11 May 2010 |
Bagasse based Cogeneration Project at Barkatpur, District- Bijnor, UP, India | Uttam Sugar Mills Limited | India | 11 May 2010 |
Introduction of a new LNG based cogeneration system in Gwanggyo branch of Korea District Heating Corporation for supply of heat to a district heating system and electricity to the power grid | Korea District Heating Corporation | Republic of Korea | 10 May 2010 |
Inner Mongolia Wuchuan Yihemei Wind Farm 49.5MW Project | Carbon Resource Management S.A. | China | 10 May 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: