Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 483 | 484 | 485 | 486 | 487 | ... 669 >>
Displaying 9681-9700 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Energy Efficiency Improvements in PEMEX Refinery Madero Petróleos Mexicanos Mexico 13 May 2010
Grid Connected Wind Power Project M/s. Rajasthan Gum private Limited India 13 May 2010
Comprehensive and sustainable improvements of the public transit service in the city of Arequipa Arequipa Province Municipality Peru 13 May 2010
Guangxi Ziyuan Fengyuan Hydropower Project Guangxi Ziyuan Fengyuan Hydropower Development Corporation Limited China 13 May 2010
0.750 MW Wind Power CDM Project by M/s. Anup Engineering Limited in Gujarat, Kutch, India M/s. Anup Engineering Limited India 13 May 2010
115 MW Grid connected natural gas power project by PGPL in Maharastra, India M/s. Pioneer Gas Power Limited India 13 May 2010
Wind & solar hybrid power Project in Beijing Guangting Wind Farm Beijing Jingneng Energy Technology Investment Co., Ltd China 13 May 2010
0.225 MW Wind Power CDM Project by M/s. Madion Health Care Pvt. Ltd. M/s. Madion Health Care Pvt. Ltd. India 13 May 2010
Biogas recovery and electricity generation from anaerobic treatment of industrial wool scouring effluent Lanas Trinidad S. A. Uruguay 13 May 2010
Energy Efficiency Improvements at PEMEX Refinery Cadereyta Petroleos Mexicanos (Pemex) Mexico 13 May 2010
Heilongjiang Mingshui Biomass Cogeneration Project Accord Global Environment Technology(Beijing)Co., Ltd China 13 May 2010
0.225 MW Wind Power CDM Project by MR. Vinod Vora in Gujarat, Kutch, India M/s. Veer Energy & Infrastructure Ltd. India 13 May 2010
0.225 MW Wind Power CDM Project by Mr. Kanti N. Gada in Gujarat, Kutch, India M/s EnKing International, Indore (India) India 13 May 2010
Guangdong Xingang Wind Power Project China resources wind power Development Co., Ltd China 13 May 2010
Recovery and Utilization of Waste Gas at PEMEX Refinery Minatitlan Petroleos Mexicanos (Pemex) Mexico 13 May 2010
Bundle Wind Power Project - EnKing International (CDM.Feb-10-02) EnKing International India 12 May 2010
Nam Cun Hydropower Project Carbon Resource Management S. A. Viet Nam 12 May 2010
Nam Hoa 2 Hydro Power Project EVN Finance Joint Stock Company Viet Nam 12 May 2010
Implementation of Green Structures Embassy Property Private Limited India 12 May 2010
1.5 MW Wind Power CDM Project by SVC Projects Pvt Ltd, Andhra Pradesh, India SVC Projects Pvt Ltd. India 12 May 2010