10:39 13 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
10941-10960
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Energy Generation from biomass at MERHAV´s ethanol Plant | Merhav Renewable Energies Limited | Colombia | 23 Dec 2009 |
0.6 MW Wind Power Project at Barmer | M/s Chemicals and Minerals Industries Pvt. Ltd. | India | 23 Dec 2009 |
Yunnan Nanwahe River Bundled Hydropower Project of China | Accord Global Environment Technology (Beijing)CO,.LTD. | India | 23 Dec 2009 |
Rehabilitation of the Small Hydroelectric Power Plant of La Navetta in Apulo | CEMEX COLOMBIA S.A. | Colombia | 23 Dec 2009 |
0.6 MW Wind Power Project at Jaisalmer2 | M/s Agarwal Petrochem Private Limited | India | 23 Dec 2009 |
Coca Cola Bottlers Philippines, Inc. Greenhouse Gas (GHG) Mitigation Projects in the Philippines (Bundle 2) | Coca Cola Bottlers Philippines, Inc. | Philippines | 23 Dec 2009 |
Heilongjiang Jiamusi Jianshan Wind Farm Project | China Resources Wind Power Development Co., Ltd | China | 23 Dec 2009 |
Substitution of Diesel for electricity from the National Interconnected System in the Caracara Oil concession in Puerto Gaitán, Colombia | OPTIM Consult Ltd. | Colombia | 23 Dec 2009 |
0.6 MW Wind Power Project at Barmer | M/s Sigma Minerals Limited | India | 23 Dec 2009 |
1.25 MW Wind Power Project at Jaisalmer | M/s Art and Crafts Inc. | India | 23 Dec 2009 |
Introduction of low emission vehicles to the commercial fleet of CEMEX | CEMEX COLOMBIA S.A. | Colombia | 23 Dec 2009 |
UEE Coxilha Negra V | ELETROSUL Centrais Eletricas S.A. | Brazil | 22 Dec 2009 |
ToughStuff Solar Panel and Lamp Sales Madagascar | ToughStuff International Limited | Madagascar | 22 Dec 2009 |
Hebei Shenxiandong Wind Power Project | China resources wind power Development Co., Ltd. | China | 22 Dec 2009 |
0.6 MW Wind Power Project at Akal, Jaisalmer | M/s Sharma Industries | India | 22 Dec 2009 |
Shanxi Changcheng Wind Power Project | China resources wind power Development Co., Ltd | China | 22 Dec 2009 |
Waste Heat Recovery and Energy Efficiency Improvement Project in Drying System of Tangshan Monopy Ceramic Industry Co., Ltd | Uniufa Energy Technology Co., Ltd. | China | 22 Dec 2009 |
Inner Mongolia Baotou Huiquan Baiyunebo Wind Farm Project | Inner Mongolia MengDian HuaNeng Thermal Power Co. Ltd | China | 22 Dec 2009 |
Bundle Wind Power project - EnKing International (CDM.OCT-09-01)2 | EnKing International | India | 22 Dec 2009 |
UEE Coxilha Negra VII | ELETROSUL Centrais Eletricas S.A. | Brazil | 22 Dec 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: