Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 545 | 546 | 547 | 548 | 549 | ... 669 >>
Displaying 10921-10940 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Palmeira Small Hydropower plant project of greenhouse gases emission reduction BioGerar Cogeração de Energia Ltda Brazil 28 Dec 2009
Energy generation using renewable biomass in Uttar Pradesh, India Sri Laxmi Cotsyn Limited India 28 Dec 2009
Sumez Hydro Electric Power Project in Himachal Pradesh, India Ranga Raju Warehousing Private Limited India 28 Dec 2009
Zhanjiang Biomass Power Generation Project in Guangdong Province Guangdong Yudean Zhanjian Biomass Power Generation Co., Ltd. China 26 Dec 2009
1.25 MW Wind Power Project Indian Securities Limited India 25 Dec 2009
Guangzhou Clinker Production Lines Greenstone Carbon Asset Management Co., Ltd. China 25 Dec 2009
District Heating Project of Yanji City Dongchen Environmental-Energy Heat Supplying Co., Ltd Yanji City Dongchen Environmental-Energy Heat Supplying Co., Ltd China 25 Dec 2009
0.6 MW Wind Power Project at Barmer M/s Delhi Rajasthan Transport Co. Ltd. India 24 Dec 2009
Replacement of electricity generated by existing 4 subcritical units of 120 MW of Koradi TPS by 1 unit of 660 MW based on supercritical technology Maharashtra State Power Generation Company Limited India 24 Dec 2009
Inner Mongolia Bayannur Small Hydropower Project Bayannur City Hetao Hydropower Co., Ltd. China 24 Dec 2009
Grid connected renewable electricity generation in Kerala M/s. ACV Products Private Limited India 24 Dec 2009
FO to NG fuel switch project activity at WGSRL Welspun Gujarat Stahl Rohren Ltd. (Plait and Coil Mill Division), Anjar India 24 Dec 2009
Hunan Tongba Small Hydropower Project Zhuzhou Hongtai Hydroelectric Co., Ltd. China 24 Dec 2009
SEEE Nanshan Second Phase MSW Power Generation Project. Laohukeng Environmental Area.pdf Shenzhen Energy Environmental Engineering Co., Ltd China 24 Dec 2009
Yeongam Green photovoltaic power generation EcoNetwork Co., Ltd. (CDM consulting corporation) Republic of Korea 24 Dec 2009
Wuhan jiangbei west (Xingou) municipal solid waste (MSW) power generation project Shenzhen Energy Environmental Engineering Co., Ltd China 24 Dec 2009
Hubei Wufeng Bundled Small Hydropower Project Wufeng Fuyuan Hydropower Co., Ltd. China 24 Dec 2009
Hunan Hongwei Mining CMM utilization project. Accord Global Environment Technology (Beijing) Co., Ltd. China 24 Dec 2009
Bio gas Utilization at The Krabi Oil-Palm Farmers Cooperatives Federation Limited Provincial Electricity Authority Thailand 24 Dec 2009
Methane capture and utilization at MERHAV´s ethanol production Plant in Colombia Merhav Renewable Energies Limited Colombia 23 Dec 2009