Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 538 | 539 | 540 | 541 | 542 | ... 669 >>
Displaying 10781-10800 of 13375 notifications.
Project Title Entity Name Host Party Date Received
WAMS Project2 Ashish Builders Pvt. Ltd. India 13 Jan 2010
Installation of 240 MW Hydro Electric Project at Kutehr in the Chamba district of Himachal Pradesh by JSW Energy Limited JSW Energy Limited India 12 Jan 2010
Integrated Municipal Solid Waste Project at Hyderabad Ramky Enviro Engineers Limited India 12 Jan 2010
Dunas de Paracuru Wind Farm Ventos Brasil Comercio e Representacao Ltda. Brazil 12 Jan 2010
Minas I SoWiTec trading GmbH Uruguay 12 Jan 2010
Wind based power generation by ZF Steering Gear (India) Limited in Maharashtra, India ZF Steering Gear (India) Limited India 12 Jan 2010
Dak Lo Hydropower Project Song Da 3- Dak Lo Hydropower JSC Viet Nam 12 Jan 2010
Jilin Gongzhuling Biomass Generation Project National Gongzhuling Bio Energy Co. Ltd. China 12 Jan 2010
3.0MW Wind Power Project activity by BVSR Constructions Pvt Ltd BVSR Constructions Pvt Ltd India 12 Jan 2010
2.1 MW Vinasse Based Electricity Generation at Mumias Sugar Company Limited Mumias Sugar Company Limited Kenya 11 Jan 2010
Biomass Power Project of Gia Lai Cane Sugar Thermoelectricity Joint Stock Company Gia Lai Cane Sugar Thermoelectricity Joint Stock Company Viet Nam 11 Jan 2010
Shaanxi Luneng Jingbian Wind Power Project Shaanxi Luneng Jingbian Wind Power Limited China 11 Jan 2010
SAMS Wind Project9 Agrinergy Consultancy Pvt Ltd India 11 Jan 2010
Bundled Wind Power project by Savita Oil Technologies Ltd. Savita Oil Technologies Ltd. India 11 Jan 2010
Biomass based thermal energy generation at Omkaareshwar Solvex, India M/s Omkaareshwar Solvex Pvt. Ltd. India 11 Jan 2010
Fresh Water Ship Transportation Zohreh Fresh Water JCV Kuwait 11 Jan 2010
Xinya cogeneration project from the incineration of paper waste and sludge Aretae Pte Ltd China 11 Jan 2010
Fuel Switch Project at Annakut Biscuit Company Pvt. Ltd. Annakut Biscuit Company Pvt. Ltd. India 09 Jan 2010
Wind Power generation by Miraj Products Private Limited Miraj Products Private Limited India 09 Jan 2010
0.8 MW Wind Power CDM Project by Sabarmati Construction Company, Nasik Maharashtra, India Sabarmati Construction Company India 09 Jan 2010