07:41 12 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
10741-10760
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
SUZLON BARMER WIND POWER PROJECT | Oswal Cables Private Ltd Jaipur India | India | 15 Jan 2010 |
Biogas Utilization at the Krabi Oil-Palm Farmers Cooperatives Federation Limited | Provincial Electrricity Authority | Thailand | 15 Jan 2010 |
Vinh Son 4 Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 15 Jan 2010 |
BANG SAO TONG Landfill | Green Nano Co., Ltd | Thailand | 15 Jan 2010 |
Biomass based Co-generation project by Sterling Agro Industries Ltd. | Sterling Agro Industries Ltd | India | 15 Jan 2010 |
Thu Cuc Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 15 Jan 2010 |
Brasil Bio Fuels Tefé Renewable Energy Power Generation Project. | EcoSecurities International Ltd. | Brazil | 15 Jan 2010 |
Muong Sang 2 Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 15 Jan 2010 |
Tat Ngoang Hydroopower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 15 Jan 2010 |
Sichuan Guoru Hydropower Project | Danba Donggu River Hydropower Development Ltd | China | 14 Jan 2010 |
A Waste Heat Recovery for Power Generation Project in Metallurgy Industry of China | Pinglu Changsheng Stainless Steel Burden Material Co., Ltd | China | 14 Jan 2010 |
Waste Heat Recovery Captive Power Project Nabagram | Ispat Damodar Limited | India | 14 Jan 2010 |
Zhengzhou Tuoyang Boiler Retrofitting Project | Zhengzhou Tuoyang Industry Co., Ltd. | China | 14 Jan 2010 |
1.2 MW Wind Energy Project at Palladam, Tamil Nadu, India of Yukhta Wind Farm Pvt. Ltd. | Yuktha Wind Farm Pvt. Ltd. | India | 14 Jan 2010 |
The TRT Project of No. 1 and No. 3 Blast Furnace, WeiYuan steel & Iron Co., Ltd of Sichuan Tranvic Group Co., Ltd. | WeiYuan Steel & Iron Co., Ltd of Sichuan Tranvic Group Co., Ltd | China | 14 Jan 2010 |
The TRT Project of No. 4 and No. 5 Blast Furnace, WeiYuan steel & Iron Co., Ltd of Sichuan Tranvic Group Co., Ltd. | WeiYuan steel & Iron Co., Ltd of Sichuan Tranvic Group Co., Ltd | China | 14 Jan 2010 |
CSTR Installation for ethanol pulp and wastewater treatment in Ratchaburi Province | S P M Feed mill Co., Ltd. | Thailand | 14 Jan 2010 |
Trung Ho & Van Ho Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 13 Jan 2010 |
Tam Thanh Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 13 Jan 2010 |
Kezuohou Banner Huadeng 49.5MW Wind Farm Project | CPI Carbon Asset Management Co., Ltd. | China | 13 Jan 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: