19:15 17 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
9381-9400
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Fuel Switching from Mazout to Natural Gas 5 | Sugar and Integrated Industries Company (SIIC) | Egypt | 17 Jun 2010 |
Fuel Switching from Mazout to Natural Gas 3 | Sugar and Integrated Industries Company (SIIC) | Egypt | 17 Jun 2010 |
Wind power project of NFCL in Tamil Nadu | Nagarjuna Fertilizers and Chemicals Limited | India | 17 Jun 2010 |
Connection of the Costayaco Oil Wells to the National Electricity Grid | GRAN TIERRA ENERGY INC. | Colombia | 17 Jun 2010 |
Grid connected, energy efficient power plant in Junagadh, Gujarat by SPEPL | Shapoorji Pallonji Energy (Gujarat) Pvt. Ltd. | India | 17 Jun 2010 |
23 MW BIOMASS BASED POWER PROJECT IN JHARSUGUDA | RAKE POWER LIMITED | India | 17 Jun 2010 |
Liaoning Kangping Aoliyingzi Wind Power Project | Longyuan Kangping Wind Power Co., Ltd. | China | 17 Jun 2010 |
Fuel Switching from Mazout to Natural Gas 7 | Sugar and Integrated Industries Company (SIIC) | Egypt | 17 Jun 2010 |
Fuel Switching from Mazout to Natural Gas 2 | Sugar and Integrated Industries Company (SIIC) | Egypt | 17 Jun 2010 |
Recovery and utilization of gas from the Costayaco Oil well to generate electricity. | GRAN TIERRA ENERGY INC. | Colombia | 17 Jun 2010 |
Fuel Switching from Mazout to Natural Gas 4 | Sugar and Integrated Industries Company (SIIC) | Egypt | 17 Jun 2010 |
Nam Pan 5 Hydro Power Plant Project (the "Project") | Global Petro Power Joint Stock Company | Viet Nam | 17 Jun 2010 |
Los Humeros II Phase B Geothermal Project | Comisión Federal de Electricidad. | Mexico | 16 Jun 2010 |
Cerro Prieto V Geothermal Project | Comisión Federal de Electricidad | Mexico | 16 Jun 2010 |
2 MW Biomass based Power Generation Project in Tamilnadu, India | Omkar Power Generation (P) | India | 16 Jun 2010 |
Aditya Marine Ltd., 1.25 MW Wind Power Project 2010 | ADITYA MARINE LIMITED | India | 16 Jun 2010 |
Grid Connected Wind Power Project in Tamilnadu by Spike Power Protection Systems & Technologies | Spike Power Protection Systems & Technologies | India | 15 Jun 2010 |
Song Bung 2 Hydro Power Project (the "Project") | Song Bung Hydro Power Management Board | Viet Nam | 15 Jun 2010 |
Kalamasai Bio-Power Project | Kalamasai Bio Power Co., Ltd | Thailand | 15 Jun 2010 |
Private proposal project for electrified, double track SBL Extension (Jeongja - Gwanggyo) | Kyunggi Railroad Co., Ltd. | Republic of Korea | 15 Jun 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: