09:15 17 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
9201-9220
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Hubei Provice Tianhe Stream Cascade Hydroelectric Project | EcoSecurities International Limited | China | 07 Jul 2010 |
10.2 MW bundled wind energy project in the state of Rajasthan and Tamil Nadu | KRBL Limited, 5190 Lahori Gate, Delhi | India | 07 Jul 2010 |
Wind Power Project by Aparna Yarn Traders in Tamil Nadu, India | Aparna Yarn Traders | India | 06 Jul 2010 |
CDQ & Waste Heat Recovery Project of Hunan VALIN Xiangtan Iron & Steel Co., Ltd | Hunan VALIN Xiangtan Iron & Steel Co., Ltd. | China | 06 Jul 2010 |
Duojiashan Expansion Small Hydropower Project in Gansu province | Zhehe Hydropower Development Co., Ltd. in Zhuoni County | China | 06 Jul 2010 |
1.6 MW Wind Power CDM Project by Babu Silk & Sarees, Kanchipuram, Tamil Nadu, India | Babu Silk & Sarees | India | 06 Jul 2010 |
Niros Ispat WHRB CDM - Project | Niros Ispat (P) Ltd. | India | 06 Jul 2010 |
Wind power project in Tamil Nadu, India | RVK Energy Pvt Ltd. | India | 06 Jul 2010 |
Ferreira Gomes Hydro Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 06 Jul 2010 |
Swine’s manure treatment of Zeroemissions do Brasil n 1 | Zeroemissions do Brasil | Brazil | 06 Jul 2010 |
Flare Gas Recovery and utilisation in SOPC | Masdar (Abu Dhabi Future Energy Company) | Egypt | 06 Jul 2010 |
Jetty Boil-Off Gas Recovery Project | Qatar Petroleum | Qatar | 06 Jul 2010 |
Garibaldi Hydro Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 06 Jul 2010 |
Yunnan Tengchong County Yinhe Hydropower Project | ACT Global Environment Technology Co., Ltd. | China | 05 Jul 2010 |
Eco-friendly manufacturing of Autoclaved Aerated Concrete Panels & Blocks by using fly ash at Powerdeal Energy Systems (India) Pvt. Ltd. Nashik | POWERDEAL ENERGY SYSTEMS(I)PVT.LTD. | India | 05 Jul 2010 |
East Hope Baotou Retrofit for Energy Saving and Efficiency Improvement of Aluminum Production Electrolysis Bath Project | East Hope Baotou Rare Earth Aluminum Co., Ltd. | China | 05 Jul 2010 |
0.8 MW Wind Power CDM Project by Prakash Sarees, Kanchipuram, Tamil Nadu, India | Prakash Sarees | India | 05 Jul 2010 |
USINA AWMS PROTASIO ALVES | BMK | Brazil | 05 Jul 2010 |
4 MW Small Hydro Project by USP Hydro Energy Ltd. | USP Hydro Energy Ltd. | India | 03 Jul 2010 |
Grid connected renewable Wind Energy based Electricity Generators (WEGs) in Tamil Nadu, (Sri Padmabalaji Steels Pvt Ltd - 2 Nos 600 KW - Bundled project by RRB Energy Limited) | M/s Sri Padmabalaji Steels Pvt Ltd | India | 03 Jul 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: