05:22 16 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8941-8960
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Lajeado Grande I Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Palmas Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Lajeado Grande II Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Anhui Huqian Fuel Switch From Coal to Wood Residuals for Heat Generation Project | Anhui Fuyang Huqian Wood-based Panel Manufacturing Co Ltd. | China | 04 Aug 2010 |
To Buong Hydropower Plant, Vietnam | Ecotawa AG | Viet Nam | 04 Aug 2010 |
Macuge Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda | Brazil | 04 Aug 2010 |
Lagoas de Touros III Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Villa Sequeira Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Araripe I Wind Power Plant CDM Project Activity | Ecopart Assessoria em Negócios Empresariais Ltda. | Brazil | 04 Aug 2010 |
Oil/Gas Flare Elimination Project in Nigeria | Colechurch International Limited | Nigeria | 04 Aug 2010 |
3.0 MW Wind Power Project by R. M. Dhariwal (HUF) | R. M. Dhariwal (HUF) | India | 04 Aug 2010 |
Grid connected Small Hydel Project by M/s APEDA BSS Energy Development Pvt. Ltd. | M/s APEDA BSS Energy Development Pvt. Ltd. | India | 03 Aug 2010 |
Fuel Switch-Project Activity at Pradip Overseas Limited, Ahmedabad | Pradip Overseas Ltd. | India | 03 Aug 2010 |
Escravos Oil Field Associated Gas Recovery and Utilization Project | Chevron Nigeria Limited | Nigeria | 03 Aug 2010 |
Grid Connected Wind Power Project | M/s. B. G. Shirke Construction Technology Pvt. Ltd. | India | 03 Aug 2010 |
Santa Bárbara Hydroelectric Plant’s Rehabilitation 50 MW-Nicaragua | Empresa Nicaragüense de Electricidad | Nicaragua | 03 Aug 2010 |
10 MW Biomass based Power Project by Sanjog Sugars & Eco Power Private Limited | Sanjog Sugars & Eco-Power Private Limited | India | 03 Aug 2010 |
Centroamérica Hydroelectric Plant’s Rehabilitation 50 MW-Nicaragua | Empresa Nicaragüense de Electricidad | Nicaragua | 03 Aug 2010 |
Energy efficient brick manufacturing using FALG technology by Utkal Green Energy Limited | Utkal Green Energy Limited | India | 03 Aug 2010 |
Bagasse cogeneration project at Lam Son Sugar JSC | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 03 Aug 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: