13:15 15 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8621-8640
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Majes Solar 20T: 20 MW Solar Photovoltaic Power Plant | GTS Majes S. A. C. | Peru | 09 Sep 2010 |
Panamericana Solar 20TS: 20 MW Solar Photovoltaic Power Plant | Panamericana Solar S. A. C. | Peru | 09 Sep 2010 |
Pintado Wind Farm | Palmatir S. A. | Uruguay | 09 Sep 2010 |
Tianjin Dagang Wind Farm Phase I 49.5MW Project | Tianjin Guodian Jieneng Power Company Limited | China | 09 Sep 2010 |
Bundled Wind Power project-EnKing International (CDM.MAY-10-01) 4 | EnKing International | India | 09 Sep 2010 |
LTML Wind Energy Project in Tamil Nadu | Loyal Textile Mills Private Limited | India | 09 Sep 2010 |
Yanchuan Solar Cooker Project | Yanchuan Chengyu Energy Co. Ltd., China | China | 09 Sep 2010 |
Tianjin Dagang Wind Farm Phase 2 49.5MW Project | Tianjin Guodian Jieneng Power Company Limited | China | 09 Sep 2010 |
1.50 MW Wind Power Project CDM project by.M/s. Best Paper Mills Pvt. Ltd. 2, Ground Floor, Ram Niwas, Paranjape, "B" Scheme Road No. 3, Vile Parle East, Mumbai-400 057. | Best Paper Mills Private Limited | India | 09 Sep 2010 |
Santo Antonio do Caiapó Small Hydro Power Plant - CDM Project | Rialma Companhia Energética IV S/A | Brazil | 09 Sep 2010 |
Qinghai Xining Calcium Carbide Residue Utilization for Clinker Production Project | Qinghai Cement Co., Ltd | China | 09 Sep 2010 |
Tacna Solar 20TS: 20 MW Solar Photovoltaic Power Plant | Tacna Solar S. A. C. | Peru | 09 Sep 2010 |
Waste Gas Recovery | Development Bank of the Philippines for an on behalf of Tresure Steelworks Corporation | Philippines | 08 Sep 2010 |
Quilvio Cabrera Wind Farm Project | Consorcio Energético Punta Cana - Macao | Dominican Republic | 08 Sep 2010 |
La Charanga Methane Recovery Project | Altamar S.A. | Colombia | 08 Sep 2010 |
Kalahari Solar Park | Group Five (Pty) Ltd | South Africa | 08 Sep 2010 |
Nam Mo Hydropower Project | Ban Ve Hydropower Joint Stock Company | Viet Nam | 08 Sep 2010 |
Harnessing Hydropower Project of the Basins of Lavasén and Quishuar rivers (Cativén 1 and Cativén 2 Hydropower Plants) | Compañia Minera Poderosa S.A. | Peru | 08 Sep 2010 |
Rehabilitation for Blast Furnace | Egyptian Iron and Steel Company | Egypt | 08 Sep 2010 |
Chifeng Wengniuteqi Wind Farm Project | CPI Carbon Asset Management Co., Ltd. | China | 08 Sep 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: