19:21 14 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8241-8260
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Biomass Based Power Project in Sundargarh, Orissa | RAKE POWER LIMITED | India | 26 Oct 2010 |
Utilization of Biomass in Bricks Manufacturing | Ozone Envirotech (P) Ltd. | India | 26 Oct 2010 |
Wind Power project of Ecoren in Maharashtra | Ecoren Energy India Pvt Ltd | India | 26 Oct 2010 |
Barapole Small Hydro Electric Project | Kerala State Electricity Board | India | 26 Oct 2010 |
Xinjiang Tacheng Tianrun Mayitasi Wind Farm Project (Phase II) | Beijing Tian Run New Energy Investment Co., Ltd (on behalf of the project owner "Tacheng Tianrun New Energy Co., Ltd") | China | 25 Oct 2010 |
Hebei Shangyi Hanjiazhuang Phase II Wind Farm Project | Carbon Resource Management S.A. | China | 25 Oct 2010 |
Steam Generation Process | Zip Gildan Honduras Properties S. de R. L | Honduras | 25 Oct 2010 |
DakDrinh 2 Hydro Power Project | EVN Finance Joint Stock Company | Viet Nam | 25 Oct 2010 |
Jubilee Oil Field Associated Gas Recovery and Utilization Project | Carbonswiss AG | Ghana | 25 Oct 2010 |
Shanxi Yulong Youyu Niuxinbao Wind Farm Project | Shanxi Yulong Investment Group Co., Ltd | China | 25 Oct 2010 |
RP-490 Hydroelectric project | Hidropiedra S.A. | Panama | 25 Oct 2010 |
Hongkew (M) Sdn. Bhd. Gua Musang Integrated Cement Plant | Hongkew Holdings (M) Sdn. Bhd (HHSB) | Malaysia | 25 Oct 2010 |
Installation of fuel efficient smokeless cook-stoves in small way-side hotels of Andhra Pradesh | Winrock International India | India | 25 Oct 2010 |
Shanxi Shuozhou Pinglu Dataishan Wind Farm project (Phase I) | Beijing Tian Run New Energy Investment Co., Ltd (on behalf of the project owner "Shuozhou Pinglu Tianhui Wind Power Co., Ltd") | China | 25 Oct 2010 |
Shandong Yicheng 25MW Biomass Power-only plant Project | Chongqing Fufeng Cement Group Co., Ltd. | China | 25 Oct 2010 |
Guodian Xinjiang Alashankou Phase II Wind Power Project | Guodian Xinjiang Alashankou Wind Power Development Co., Ltd. | China | 25 Oct 2010 |
Serra de Santana II Wind Farm | Gestamp Eólica Lagoa Nova S.A. | Brazil | 25 Oct 2010 |
Pedra do Reino III Wind Farm | Gestamp Eolica Pedra do Reino S.A. | Brazil | 25 Oct 2010 |
Cogeneration based on renewable biomass and biogas in Nueva Palmira, Uruguay. | ENRESUR | Uruguay | 25 Oct 2010 |
Serra de Santana I Wind Farm | Gestamp Eólica Serra de Santana S.A. | Brazil | 25 Oct 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: