09:11 14 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8061-8080
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Cerro del Águila | Kallpa Generación S.A. | Peru | 15 Nov 2010 |
Electricity generation using windmill in Tamil Nadu by Ram Conductors and Transformer P Ltd - -Bundled project by Sreyas Corporate Concepts Private Limited | M/s. RAM CONDUCTORS AND TRANSFORMER PVT LTD | India | 15 Nov 2010 |
Sichuan Lisen Agaric Fungi Residue. Substitution of Coal as Fuel for Cement Production | Sichuan Building Material Group Ltd. | China | 15 Nov 2010 |
Absa Towers West Energy Centre Project | CDM Africa Climate Solutions (Pty) Ltd | South Africa | 15 Nov 2010 |
Extension and Technical transformation of Zhongfang Sanjiaotan Hydropower Station Project | Huaihua City Yulong Hydropower Development Co., Ltd | China | 15 Nov 2010 |
Wind Power Project at Kutch by Powerica Limited | Powerica Limited | India | 15 Nov 2010 |
REHABILITATION OF THE MPIANA MWANGA HYDROPOWER STATION | Hydro Power Congo (HPC) sprl | Democratic Republic of the Congo | 15 Nov 2010 |
Biogas utilization CDM project based on anaerobic digestion of organic material | Daegu Metropolitan City | Republic of Korea | 15 Nov 2010 |
Jiangsu Taizhou biomass cogeneration Project | Jiangsu Luen Mei Bio-energy Company Limited. | China | 15 Nov 2010 |
Hebei Zhangbei Lijiaying Wind Farm Project | Carbon Resource Management S.A. | China | 15 Nov 2010 |
Biomass based Thermal Energy Generation at Patanjali Natural Coloroma (P) Limited | Patanjali Natural Coloroma (P) Limited | India | 15 Nov 2010 |
0.750 MW Wind Power Project activity by Surana Ventures Limited | Surana Ventures Limited | India | 15 Nov 2010 |
Huaneng Shandong Hekou Phase IV Wind Farm Project | Carbon Resource Management S.A. | China | 15 Nov 2010 |
0.8 MW Wind Power CDM Project by Powerlink System Pvt. Ltd, Tamilnadu, India | Powerlink System Pvt. Ltd. | India | 15 Nov 2010 |
Solar Power Project by SunBorne Energy Gujarat One Private Limited | SunBorne Energy Gujarat One Private Limited | India | 15 Nov 2010 |
0.8MW Wind Power CDM Project by Texonic Instruments | TEXONIC INSTRUMENTS | India | 15 Nov 2010 |
0.8 MW Wind Power CDM Project by Sri Saradhambika Spintex (P) Ltd, Coimbatore, Tamil Nadu, India | Sri Saradhambika Spintex (P) Ltd. | India | 15 Nov 2010 |
15MW Captive Power Plant of Shree Ram Electrocast Pvt. Ltd. (Karnataka), using Partly Waste Gases, Partly Biomass & Partly Coal as a fuel. | SHREE RAM ELECTROCAST PVT. LTD. | India | 15 Nov 2010 |
.600 MW Wind Power Project in Tamilnadu | G.R.THANGAMALIGAI & SONS | India | 14 Nov 2010 |
1.500 MW Wind Power Project in Tamilnadu | G.R.THANGAMALIGAI (FIRM) | India | 14 Nov 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: