Displaying
7881-7900
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Grid Connected Energy Efficient Power Generation by Talwandi Sabo Power Limited | Talwandi Sabo Power Limited | India | 07 Dec 2010 |
Shanxi Xiangyuan2×12MW Biomass Generation Project | Shanxi Sanyuanhuafu Biomass Power Generation Co., Ltd. | China | 07 Dec 2010 |
CTL Landfill Gas Project | EcoUrbis Ambiental S/A | Brazil | 06 Dec 2010 |
20 MW Biomass based power generation project by South Asian Agro Industries Limited in Chhattisgarh, India | South Asian Agro Industries Limited | India | 06 Dec 2010 |
Grid connected wind power project in India by SRB Consultancy Pvt. Ltd. | M/s. SRB Consultancy Private Limited | India | 06 Dec 2010 |
Zhonggu Hydropower Project | Jiu Long County Tanggu Electricity Development Co. Ltd. | China | 06 Dec 2010 |
“Sogesic Las Armas Wind Farm” | Sogesic S.A. | Argentina | 06 Dec 2010 |
Demwe Lower Hydro Electric Project; Arunachal Pradesh; India | Athena Demwe Power Limited, India | India | 06 Dec 2010 |
Tanggu Hydropower Project | Jiu Long County Tanggu Electricity Development Co. Ltd. | China | 06 Dec 2010 |
Riluku Hydropower Project | Jiu Long County Tanggu Electricity Development Co. Ltd. | China | 06 Dec 2010 |
Methane Emission Reduction in the Wood Carbonization Process. | Viena Siderúrgica S.A. | Brazil | 06 Dec 2010 |
“Sogesic wind farm I” | Sogesic S.A. | Argentina | 06 Dec 2010 |
20 MW Biomass based power generation project by Suryachakra Global Enviro Power Limited in Chhattisgarh, India | Suryachakra Global Enviro Power Limited | India | 06 Dec 2010 |
Inner Mongolia Tongliao Naimanqi Dongxing Fengying Yongxing Phase One Wind Farm 49.6MW Wind Power Generation Project | Tongliao Dongxing Fengying Wind Power Technology Co., Ltd. | China | 06 Dec 2010 |
Teenim landfill gas project | ClimaTrade L.T.D | Israel | 05 Dec 2010 |
Grid Connected wind farm renewable Energy Project | M/s Precision Controls | India | 04 Dec 2010 |
4 MW Wind Power Project by Varun Industries Ltd. in Tamilnadu, India | Varun Industries Ltd. | India | 04 Dec 2010 |
Grid Connected Energy Efficient Power Generation by Nabha Power Limited | Nabha Power Limited | India | 04 Dec 2010 |
MAFIA BIOMASS ELECTRICITY PROJECT | Ngombeni Power Ltd | United Republic of Tanzania | 03 Dec 2010 |
"HUACHIPA - COGENERATION PLANT OF 14 MW WITH GAS TURBINE" | ILLAPU ENERGY S.A. | Peru | 03 Dec 2010 |