15:18 13 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
7721-7740
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Yunnan Baoshan Sunzu River hydropower project. | Baoshan Sunzu River electric utility Co., Ltd. | China | 27 Dec 2010 |
Huadian Inner Mongolia Naiman Banner First Phase 49.5MW Wind Power Project | Arreon Carbon Trading Limited | China | 27 Dec 2010 |
Inner Mongolia Shangdu Changshengliang Wind Farm Project | Beijing Beineng Chuangye Wind Power Technology Co., Ltd. | China | 27 Dec 2010 |
Yunnan Danzhuhe 1st Level Hydropower Project | Hengyuan Hydropower Development Co., Ltd | China | 27 Dec 2010 |
Kohala Hydro Electric Power Project | WAPDA | Pakistan | 27 Dec 2010 |
Shandong Zhengda Waste Residue Burning and Boiler Retrofit Project | Shandong Zhengda Paper limited Co., Ltd (China) | China | 27 Dec 2010 |
Henan Xingtai Waste Water Treatment Project | Xingtai Paper limited Co., Ltd (China) | China | 27 Dec 2010 |
Wind Power Project by Astra Lifecare (India) Private Limited at Gujarat, India | ASTRA LIFECARE (INDIA) PRIVATE LIMITED | India | 27 Dec 2010 |
Hunan Huashun Wind Farm Project | Yuanjiang Huashun Luhu Wind Power Co., Ltd | China | 27 Dec 2010 |
Huadian International Laizhou Power Plant Phase I 2x1000MW Ultra-supercritical Project | Huadian Laizhou Power Generation Co., Ltd | China | 26 Dec 2010 |
8 MW Nannuo river hydropower project | Geng Shunchang Hydropower Development Co.,Ltd. | China | 25 Dec 2010 |
HEPP BATANG TORU 5 | PT. North Sumatera Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP BATANG TORU 3 | PT. North Sumatera Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP SIBUNDONG 5 | PT. Tapanuli Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP SIBUNDONG 4 | PT. Tapanuli Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP SIBUNDONG 3 | PT. Tapanuli Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP SIBUNDONG 2 | PT. Tapanuli Hydro Energy | Indonesia | 24 Dec 2010 |
HEPP Silau 1 | PT. Badjradaya Toba Hydro Power | Indonesia | 24 Dec 2010 |
HEPP Asahan 4 | PT. Badjradaya Toba Hydro Power | Indonesia | 24 Dec 2010 |
Fuqing MSW Incineration Project | C&G Environmental Protection (Fuqing)Co., Ltd | China | 24 Dec 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: