13:16 13 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
7661-7680
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
4.5 MW KURHED Small Hydro Electric Project in Himachal Pradesh, India of Himachal Hydel projects Private Limited | HIMACHAL HYDEL PROJECTS PRIVATE LIMITED | India | 03 Jan 2011 |
GHG mitigation through brick manufacturing process by ECO-CARE Building Products Pvt. Ltd., India. | ECO-CARE Building Products Pvt. Ltd. | India | 03 Jan 2011 |
9 MW Yadgiri small hydro electric project | M/s. Sharan Powers Private Limited | India | 03 Jan 2011 |
3.00 MW TULANG Small Hydro Electric Project in Himachal Pradesh, India of Himachal Hydel projects Private Limited | HIMACHAL HYDEL PROJECTS PRIVATE LIMITED | India | 03 Jan 2011 |
FAB CDM Project - Phase III | G K Energy Marketers Pvt Ltd | India | 03 Jan 2011 |
1.0 MW Solar Photovoltaic (SPV) in Haryana, India of VKG Energy Private Limited. | HIMACHAL HYDEL PROJECTS PRIVATE LIMITED | India | 03 Jan 2011 |
GHG abatement through installation of Intelligent Flow Control (IFC) System in the compressed air system in an aluminium smelter plant, india | National Aluminium Company Limited | India | 03 Jan 2011 |
Energy Efficiency Improvement by installation of a Continuous-Blow_Down Recovery System in the Captive Power Plant of an aluminium smelter in Orissa, India | National Aluminium Company Limited | India | 03 Jan 2011 |
FAB CDM Project - Phase II | G K Energy Marketers Pvt Ltd | India | 03 Jan 2011 |
1.00 MW Solar Photovoltaic (SPV) in Haryana, India of VKG Energy Private Limited | HIMACHAL HYDEL PROJECTS PRIVATE LIMITED | India | 03 Jan 2011 |
Landfill gas capture and utilization project implemented by Pune Municipal Corporation, India | Pune Municipal Corporation (PMC) | India | 01 Jan 2011 |
M/s.K.S.SUBBIAH PILLAI & CO.(INDIA) LTD., 1.25 MW Wind Project | M/s.K.S.SUBBIAH PILLAI & CO.(INDIA) LTD | India | 31 Dec 2010 |
Biomass based high pressure cogeneration project at Shakarganj Mills Limited, Bhone, Pakistan | Carbon Services (Private) Limited | Pakistan | 31 Dec 2010 |
Fuel Switching Project of the ShenNanDian (ZhongShan) Power Co., Ltd. | Arreon Carbon Trading Limited | China | 30 Dec 2010 |
Gansu Yemu River Lianzhuqiao Small Hydropower Project | Zhuoni County Kangduoxia Hydropower Development Co.,Ltd | China | 30 Dec 2010 |
Jiangsu Huadian Wujiang Natural Gas Based Power Generation Project | Arreon Carbon Trading Limited | China | 30 Dec 2010 |
COFCO Hubei Jindongtai Biogas Recovery Project | COFCO Wuhan Meat Product Co.,Ltd | China | 30 Dec 2010 |
15 MW Montecristi - Biomass Sorghum to Electricity CDM Project | ecosur afrique | Dominican Republic | 30 Dec 2010 |
Expansion Project of Huadian Fujian Hua'an Hydro Power Plant | Arreon Carbon Trading Limited | China | 30 Dec 2010 |
0.6 MW Wind Power CDM Project by Sharma Industries, Rajasthan, India | Sharma Industries | India | 30 Dec 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: