Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 328 | 329 | 330 | 331 | 332 | ... 669 >>
Displaying 6581-6600 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Bundled Wind Power Project- EnKing International (CDM.Dec-10-01) 18 EnKing International India 02 May 2011
0.25 MW Wind power generation in Tirunelveli district by Gupta Garments Gupta Garments India 02 May 2011
Fuel Switching at Nestle Nestlé México, S.A. de C.V. Mexico 02 May 2011
Namarestagh Hydropower Plant Iran Water and Power Resources Development Co. (IWPCO) Iran (Islamic Republic of) 02 May 2011
Wind Power Project KHTPL (EKI-CDM.Feb-11-01) Kishangarh Hi-Tech Textile Park Ltd. India 02 May 2011
Household biogas project in Maharashtra Core CarbonX Solutions Pvt. Ltd. India 30 Apr 2011
Bundled Wind Power Project Activity by PPS Enviro Power Pvt. Ltd. 2 PPS Enviro Power Pvt. Ltd. India 30 Apr 2011
Central Eolica Sao Joao, Central Eolica Sao Jorge, Central Eolica Santo Antonio, Central Eolica Sao Pedro, Central Eolica Sao Cristovao, Central Eolica Sao Tome Abengoa Construcao Brazil Brazil 30 Apr 2011
Dasu Hydro Electric Power Project Water and Power Development Authority (WAPDA) Pakistan 30 Apr 2011
Bundled Wind Power Project Activity by PPS Enviro Power Pvt. Ltd. 3 PPS Enviro Power Pvt. Ltd. India 30 Apr 2011
Bundled grid connected solar power projects by Zamil New Delhi Infrastructure Private Limited Zamil New Delhi Infrastructure Private Limited India 29 Apr 2011
Green Energy Project at Gujarat by Powerica Limited Powerica Limited India 29 Apr 2011
Parque Eólico Triunfo SoWiTec trading GmbH Brazil 29 Apr 2011
Langfang MSW Incineration Project (Langfang) Co., Ltd. C&G Environmental Protection China 29 Apr 2011
Switching from vehicles by combustion engines to electric two-wheeled vehicles CR ZONGSHEN Fabricadora de Veículos S.A. Brazil 29 Apr 2011
Utema-Usina Termelétrica Manacá Ltda. Pleuston Serviços Ltda. Brazil 28 Apr 2011
Biomass Based Power Project at Raipur Shanti G.D. Ispat & Power Pvt. Limited India 28 Apr 2011
D18+ Enhancement project Dubai Carbon Centre of Excellence (DCCE) United Arab Emirates 28 Apr 2011
Methane Recovery and Utilisation at PT. Sukajadi Sawit Mekar Palm Oil Mill #2 at Central Kalimantan, Indonesia PT. Sukajadi Sawit Mekar Indonesia 28 Apr 2011
Grid Connected Solar Power Project in Gujarat by GHI Energy Private Limited GHI Energy Private Limited India 28 Apr 2011