12:12 05 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
6361-6380
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Grid interactive solar photovoltaic power project in Gujarat | Louroux Bio Energies Ltd, | India | 24 May 2011 |
18 MW Wind Power Generation at El Zafarana area by Arab Organization for Industrialization (AOI) | Arab Organization for Industrialization (AOI) | Egypt | 24 May 2011 |
Wave Energy Generation project in Puerto Tuxpan, Mexico | Mareomotrices de Energias Renovables, S.A. de C.V. | Mexico | 24 May 2011 |
K-water hydropower VII | K-water (Korea Water Resources Corporation) | Republic of Korea | 24 May 2011 |
K-water hydropower IX | K-water (Korea Water Resources Corporation) | Republic of Korea | 24 May 2011 |
Biomass based power project in Tarpur, Indore | A2Z Maintenance & Engineering Services Limited | India | 23 May 2011 |
Natural Gas based Combined Cycle Power Plant by HEGCPL near Talegaon, Pune - Phase-1 Block-1 | Hindustan Electricity Generation Company Private Limited (HEGCPL) | India | 23 May 2011 |
Hebei Laoting biomass combined stoves and heater (BCSH) Project 2 | Sindicatum Carbon Capital (Cayman) Ltd. | China | 23 May 2011 |
Khau Chu Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 23 May 2011 |
Biomass based power project in Bhadra, Rajasthan | A2Z Maintenance and Engineering Services Limited | India | 23 May 2011 |
Methane Recovery and Utilization Project of Yangxin Jinyuan Bio-tech. Group Co., Ltd. | Uniufa Energy Technology Co., Ltd | China | 23 May 2011 |
Biomass based power project in Fatehpur, Rajasthan | A2Z Maintenance and Engineering Services Limited | India | 23 May 2011 |
Biomass based power project in Kolayat, Rajasthan | A2Z Maintenance and Engineering Services Limited | India | 23 May 2011 |
Hebei Laoting biomass combined stoves and heater (BCSH) Project 4 | Sindicatum Carbon Capital Limited | China | 23 May 2011 |
2x660 MW Super-Critical Thermal Power Station Stage V, Unit - 7 & 8 at Suratargh, District Sriganganagar, Rajasthan | Rajasthan Rajya Vidyut Utpadan Nigan Ltd. (RRVUNL) | India | 23 May 2011 |
2x660 MW Super-Critical Thermal Power Station Stage II, Unit - 5 & 6 at Chhabra, District Baran, Rajasthan | Rajasthan Rajya Vidyut Utpadan Nigan Ltd. (RRVUNL) | India | 23 May 2011 |
Hebei Laoting biomass combined stoves and heater (BCSH) Project 3 | Sindicatum Carbon Capital (Cayman) Ltd. | China | 23 May 2011 |
Hebei Wandu biomass combined stoves and heater (BCSH) Project 1 | Sindicatum Carbon Capital (Cayman) Ltd. | China | 23 May 2011 |
0.6MW Wind Power CDM Project by Sharma Industries, Rajasthan, India | Sharma Industries | India | 23 May 2011 |
Fuel switch from fossil fuel to biomass | Malu Paper Mills Limited | India | 23 May 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: