10:22 05 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
6301-6320
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Cubujuqui Hydroelectric Power Project | Rural Electrification Cooperative of San Carlos (COOPELESCA R. L.) | Costa Rica | 27 May 2011 |
Tepetate Wind Farm | SoWiTec trading GmbH, Germany | Mexico | 27 May 2011 |
TSE4 Song Phi Nong - Thai Solar Energy Solar Thermal Power Plant | Thai Solar Energy Co., Ltd., Thailand | Thailand | 27 May 2011 |
SF6 Recycling Project of Hebei Southern Power Grid | Arreon Carbon Trading Ltd. | China | 27 May 2011 |
TSE2 Doembangnangbuat - Thai Solar Energy Solar Thermal Power Plant | Thai Solar Energy Co., Ltd. | Thailand | 27 May 2011 |
TSE3 Dan Makhamtea - Thai Solar Energy Solar Thermal Power Plant | Thai Solar Energy Co., Ltd. | Thailand | 27 May 2011 |
Huadian Sichuan Shangtongba Hydropower Project | Arreon Carbon Trading Limited | China | 27 May 2011 |
Mezquite wind Farm | SoWiTec trading GmbH, Germany | Mexico | 27 May 2011 |
Biogas from wastewater treatment in ethanol plant Project in Ubonratchathani, Thailand | Ubon Bioethanol Co., Ltd. | Thailand | 27 May 2011 |
Caiçara 1 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Ventos do Norte 2 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Ventos do Norte 1 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Tin Thanh Biomass Boiler Project No. 8 | INTRACO Co., Ltd | Viet Nam | 26 May 2011 |
Tin Thanh Biomass Boiler Project No. 7 | INTRACO Co., Ltd | Viet Nam | 26 May 2011 |
Tin Thanh Biomass Boiler Project No. 5 | INTRACO Co., Ltd | Viet Nam | 26 May 2011 |
Ventos do Norte 4 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Ventos do Norte 6 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Ventos do Norte 5 Wind Farm | BIOENERGY | Brazil | 26 May 2011 |
Henan Fangcheng Wind Farm Project | CPI CARBON ASSET MANAGEMENT CO., Ltd. | China | 26 May 2011 |
Jiangxi Yudu Xiashan 35.1MW Hydropower Project | CPI CARBON ASSET MANAGEMENT CO., LTD. | China | 26 May 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: