Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 306 | 307 | 308 | 309 | 310 | ... 669 >>
Displaying 6141-6160 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Shanxi Shenchi Nanhuashan Wind Power Project Shanxi Longyuan Wind Power Co., Ltd. China 15 Jun 2011
Jbel Haouch Ben Kreaa wind farm project in Morocco La Compagnie du Vent Maroc Morocco 15 Jun 2011
HIDROVICTORIA hydroelectric project VHP HIDROVICTORIA S A Ecuador 15 Jun 2011
Wind Energy Project in Theni, Tamil Nadu TVS Energy Limited India 14 Jun 2011
Hyderabad Landfill Gas Management Project Hyderabad Integrated MSW Ltd (Wholly Owned Subsidiary of REEL) India 14 Jun 2011
Kipeto Wind Energy Project GE Energy Kenya 14 Jun 2011
Wind Energy Project at Tamil Nadu, India by KARMEN ENGINEERING SERVICES LLP Karmen Engineering Services LLP India 14 Jun 2011
Yunnan Luxi Donghua Wind Power Project Hydrochina Wind Power Luxi Co., LTD China 14 Jun 2011
Guohua Dalaidong Wind Farm Project Guohua (Hulunbeiber) Wind Power Co., Ltd. China 14 Jun 2011
2 MW Gasification Project ARIDEMA Cogeneración R4E Talanga SA de CV Honduras 14 Jun 2011
Bundled Wind Energy Project at Tamil Nadu, India by EAIPL Ecologikol Advisors India Private Limited India 14 Jun 2011
224 MW Wind Power Projects to reduce Green House Gases Emissions. AXIS WIND ENERGY LIMITED India 14 Jun 2011
30MW Solar PV - Monte Plata Electronic J.R.C., S.R.L. Dominican Republic 14 Jun 2011
Biomass and Biogas based cogeneration project in Andhra Pradesh, India SNS Starch Limited India 14 Jun 2011
BELO HORIZONTE HYDROELECTRIC POWER PLANT (BHHPP) Empresa Administradora Chungar SAC Peru 14 Jun 2011
Guohua Chicheng Motianling Wind Farm Project Guohua Energy Investment Co., Ltd. China 14 Jun 2011
Guohua Guyuan Xiaoerhao Wind Farm Project Guohua Energy Investment Co., Ltd. China 14 Jun 2011
Natural gas based power generation project Kamineni Steel & Power India Pvt. Ltd. India 14 Jun 2011
Guodian Shuozhou Haifeng Hutoushan 250MW Windfarm Project Guodian Shuozhou Haifeng Wind Power Co. Ltd. China 14 Jun 2011
Yunnan Luxi Dongshan Wind Power Project Hydrochina Wind Power Luxi Co., LTD China 14 Jun 2011