10:14 04 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
5841-5860
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
0.25 MW wind power generation by M/s. Babu silks and sarees | M/s. Babu silks and sarees | India | 19 Jul 2011 |
Qinghai Gonghe 30MW Solar Power Project | CPI CARBON ASSET MANAGEMENT CO., LTD. | China | 19 Jul 2011 |
0.25 MW wind power generation by M/s. A.S. Babu sah Designs | M/s. A.S. Babu Sah Designs | India | 19 Jul 2011 |
Grid Connected Renewable Energy Generation by Shiva Group | M/s. Siva Engineering Company, India | India | 19 Jul 2011 |
Wayu Wind Farm Project | Wind Energy Development Co.,Ltd.(WED) | Thailand | 19 Jul 2011 |
Yunnan Eryuan Fengle Wind Power Project | Datang Eryuan Fengyu Wind Power Co., Ltd. | China | 19 Jul 2011 |
Ezhou MSW Landfill site LFG Recovery to power project | Shanghai BCCY New Power Industry Co., Ltd. | China | 19 Jul 2011 |
Xiaogan MSW Incineration Project | C&G Environmental Protection (Xiaogan) Co., Ltd. | China | 19 Jul 2011 |
Yunnan Eryuan Qilongshan Wind Power Project | Datang Eryuan Fengyu Wind Power Co., Ltd. | China | 19 Jul 2011 |
24 MW Municipal solid waste based Power Project at Narela-Bawana, New Delhi | Delhi MSW Solutions Limited | India | 19 Jul 2011 |
Qinghai Henan 20MW Solar Power Project | CPI CARBON ASSET MANAGEMENT CO., LTD. | China | 19 Jul 2011 |
Waste heat recovery using steelmaking waste heat boiler in PT. KRAKATAU POSCO | KRAKATAU POSCO Co., Ltd. | Indonesia | 19 Jul 2011 |
Power generation using TRT (Top Pressure Recovery Turbine) in PT. KRAKATAU POSCO | KRAKATAU POSCO Co., Ltd. | Indonesia | 19 Jul 2011 |
QUISAYA HYDROELECTRIC PROJECT (Proyecto Hidroelectrico Quisaya) | HIDROFORESTAL QUISAYA S.A. (The company) | Ecuador | 19 Jul 2011 |
Liaoning Changqing Cement waste-heat power project | Liaoning Changqing Cement Co., Ltd. | China | 18 Jul 2011 |
27.3 MW Wind energy farm at Mokla Rajaasthan by HZL | Hindustan Zinc Limited | India | 18 Jul 2011 |
Afforestation of Poplar trees using best agro-forestry techniques | Oasis Agroinfra Ltd. | India | 18 Jul 2011 |
Guizhou Anshun Cement waste-heat power project | Guizhou Anshun Changxing Cement Co., Ltd. | China | 18 Jul 2011 |
Hydroelectric Power Station Murdhari in Albania | Hydroenergy Sh.p.k. | Albania | 18 Jul 2011 |
Abag Banner Huiteng Liang Wind Farm Phase I 49.5MW CDM Project | Abag Banner Anneng Wind Power Co., Ltd. | China | 18 Jul 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: