00:23 04 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
5641-5660
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
0.600 Mw Wind Power CDM Project by M/s. Rangamma Steels and Malleables | M/s. Rangamma Steels and Malleables | India | 04 Aug 2011 |
0.600 Mw Wind Power CDM Project by M/s. Rangamma Steels and Malleables | M/s Rangamma Steels and Malleables | India | 04 Aug 2011 |
Matlacobatl Hydroelectric Project | Constanza Energétca S.A. de C.V. | Mexico | 04 Aug 2011 |
106.50 MW Wind Power Projects to reduce Green House Gases Emissions | Axis Wind Energy Limited | India | 04 Aug 2011 |
Kadavakallu Wind Energy Project | Hyderabad Chemicals Limited | India | 04 Aug 2011 |
Chongqing Jinfengshan Phase II Wind Farm Project | Chongqing Water Resources Investment Group, Co. Ltd. | China | 04 Aug 2011 |
Chongqing Maocaoba Phase II Wind Farm Project | Chongqing Water Resources Investment Group, Co. Ltd. | China | 04 Aug 2011 |
PPS Enviro 2011 Wind Project | PPS Enviro Power Pvt. Ltd. | India | 04 Aug 2011 |
Wind Project by Raghuvier Sinai Gharse | Raghuvier Sinai Gharse | India | 04 Aug 2011 |
Chongqing Jinfengshan Phase I Wind Farm Project | Chongqing Water Resources Investment Group, Co. Ltd. | China | 04 Aug 2011 |
Chongqing Maocaoba Phase I Wind Farm Project | Chongqing Water Resources Investment Group, Co. Ltd. | China | 04 Aug 2011 |
0.85 Mw Wind Power CDM Proect by M/s. RSM Autokast Ltd. | M/s. RSM Autokast Ltd. | India | 04 Aug 2011 |
Implementation of Variable frequency drives for various pumps /drives of the evaporation Mud washing & SPP area in an alumina refinery in Damanjodi, Orissa-India | National Aluminum Co.Ltd. | India | 04 Aug 2011 |
Yantai Runfeng Zhuangzi Wind Farm Project | Yantai Runfeng New Energy Development Co., Ltd. | China | 04 Aug 2011 |
0.600 MW Wind Power CDM Project by M/s. RSM Autokast Ltd | RSM Autokast Ltd | India | 04 Aug 2011 |
Suoi Chan 2 Hydro Power Project | VIDIFI Power Investment Joint Stock Company | Viet Nam | 04 Aug 2011 |
Qilitang 30MW Hydro Power Project in Guizhou Province, China | Guizhou Zhongshui Energy Development Co., Ltd. | China | 04 Aug 2011 |
Solar PV Power Project by Roha Dyechem Pvt. Ltd. (EKIESL.CDM.Aug-11-02) | Roha Dyechem Pvt. Ltd. | India | 04 Aug 2011 |
0.85 Mw Wind Power CDM Project by M/s. Rangamma Steels and Malleables | M/s. Rangamma Steels and Malleables | India | 04 Aug 2011 |
Biomass Based Co-generation project at Karnal, Haryana | Shakti Bhog Foods Ltd. | India | 04 Aug 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: