20:13 03 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
5541-5560
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Oleleshwa Wind Energy Ltd | Dripland Oleleshwa Ltd | Kenya | 12 Aug 2011 |
Huaneng Shandong Yishui Mazhan Phase I Wind Power Project | Huaneng Renewables Corporation Limited | China | 12 Aug 2011 |
Bundled Wind Power Project by EnKing International (EKIESL-CDM.July-11-02) 3 | EKI Energy Services Ltd. | India | 12 Aug 2011 |
Bundled Wind Power Project by EnKing International (EKIESL-CDM.July-11-02) 2 | EKI Energy Services Ltd. | India | 12 Aug 2011 |
Bundled Wind Power Project by EnKing International (EKIESL-CDM.July-11-02) 1 | EKI Energy Services Ltd. | India | 12 Aug 2011 |
Tina Hydropower Project | PT. Buro Hydro Power | Indonesia | 12 Aug 2011 |
Parque Eólico Tucano I | SoWiTec trading GmbH, Germany | Brazil | 12 Aug 2011 |
Wind Power Plants Pontal 2B and Pontal 2C CDM Project | Força dos Ventos Energia Eólica S.A.; Enerplan Geração de Energia Eléctrica Ltda.; Enerbio Consultoria Ltda-ME. | Brazil | 12 Aug 2011 |
Parque Eólico Cristâlandia | SoWiTec trading GmbH, Germany | Brazil | 12 Aug 2011 |
Parque Eólico Ventos da Bahia | SoWiTec trading GmbH, Germany | Brazil | 12 Aug 2011 |
15 MW solar power project in Gujarat | AES Solar Energy Gujarat Private Limited | India | 12 Aug 2011 |
Huaneng Shaanxi Jingbian Longzhou Phase II Wind Farm Project | Huaneng Shaanxi Jingbian Wind Power Co.,Ltd. | China | 12 Aug 2011 |
Fumin Mayingshan 40.5MW Wind Power Project | GD Power Yunnan Fumin Wind Power Development Co., Ltd. | China | 11 Aug 2011 |
Vhavenda Bricks brick manufacturing plant - Thohoyandou, South Africa | Vhavenda Bricks (Pty) Ltd. - South Africa | South Africa | 11 Aug 2011 |
Gulf JP NK2 Project | Gulf JP NK2 Project Company Limited | Thailand | 11 Aug 2011 |
Huaneng Shandong Rushan Wind Farm Phase II and Phase III bundle Project | Huaneng Shandong Power Generation Co., Ltd | China | 11 Aug 2011 |
9.8MW Edevu Hydro Power Project | PNG Hydro Development Ltd. | Papua New Guinea | 11 Aug 2011 |
GHG emission reduction through installation of 12MW waste heat based power plant at Rashmi Metalliks Limited, India | Rashmi Metalliks Limited | India | 11 Aug 2011 |
Municipal Solid Waste Incineration for Energy Generation Project in Wuhan city, China | Wuhan Dynagreen Renewable Energy Co., Ltd. | China | 11 Aug 2011 |
Bundled wind power project by SEIPL and SPD | Shraddha Energy and Infraprojects Private Limited | India | 11 Aug 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: