Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 270 | 271 | 272 | 273 | 274 | ... 669 >>
Displaying 5421-5440 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Wind Energy Project at Tamil Nadu, India by FIL Fenner (India) Limited India 24 Aug 2011
Golden Jumping Group 12MWp Solar Power Project Golden Jumping Group Co., Ltd. China 24 Aug 2011
Nueva Esperanza Andes Generation Holding Peru 24 Aug 2011
Silicon Smelters Methane Destruction Project - 008 EcoMetrix Africa (Pty) Ltd and Silicon Smelters (Pty) Ltd South Africa 24 Aug 2011
Silicon Smelters Methane Destruction Project - 009 EcoMetrix Africa (Pty) Ltd and Silicon Smelters (Pty) Ltd South Africa 24 Aug 2011
Sichuan Huaneng Minzhi Hydropower Project Sichuan Huaneng Baoxing River Power Co., Ltd. China 23 Aug 2011
Dazhong River Fifth Cascade Small Hydropower Project in Yunnan Province Pu'er Xianglong Energy Investment Co., Ltd China 23 Aug 2011
Project Asona Takoradi International Company (TICO) Ghana 23 Aug 2011
Energy efficiency measures in a Hotel of ITC Limited ITC Limited India 23 Aug 2011
Grid connected bundled wind projects in Gujarat and Tamil Nadu GMR Renewable Energy Limited and GMR Power Infra Limited India 23 Aug 2011
Small Hydro Power project by SHPPL at Himachal Pradesh, India Sahu Hydro Power Private Limited India 23 Aug 2011
Huaneng Yunnan Eryuan Dalongtan Wind Farm Project Huaneng Eryuan Wind Power Co., Ltd China 23 Aug 2011
Small Hydro Project by Sai Engineering Foundation Sai Engineering Foundation India 23 Aug 2011
Dak Mi 2 Hydropower Project AGRITA - Quang Nam Energy Joint Stock Company Viet Nam 23 Aug 2011
Jiangxi Yuanshengyuan Chemical Co., Ltd. Methane Recovery Project Jiangxi Yuanshengyuan Chemical Co., Ltd. China 22 Aug 2011
Liaoning Changtu Tianqiaoshan Wind Farm Project JIngneng Changtu New Energy Co., Ltd. China 22 Aug 2011
COFCO Hubei JiangxiaYichang Biogas Recovery Project COFCO Wuhan Meat Product Co.,Ltd. China 22 Aug 2011
Huaneng Rudong Wind Farm Project Phase I Huaneng Rudong Wind Power Co., Ltd. China 22 Aug 2011
COFCO Jiangsu Jindongtai Biogas Recovery Project COFCO Meat (Jiangsu) Co., Ltd. China 22 Aug 2011
Qinghai Ge'ermu Xiaozaohuo Phase I 49.5MW Wind Power Project Qinghai Liteng New Energy Investment Co., Ltd. China 22 Aug 2011