10:16 03 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
5361-5380
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Olifantsrivier Wind | South African Renewable Green Energy (Pty) Ltd (SARGE) | South Africa | 30 Aug 2011 |
Karoo Renewable Energy Facility (Nobelsfontein Wind) | South African Renewable Green Energy (Pty) Ltd SARGE | South Africa | 30 Aug 2011 |
Xinjiang Huoerguosi gas pipeline compressor station waste heat recovery and ultilization for power generation project | Xinjiang Sito Energy Co., Ltd. | China | 30 Aug 2011 |
4.25MW grid connected wind farm by Avaneetha Textiles (P) Ltd., Tamil Nadu, India at village Andipatti taluk, Uthamapalayam taluk & Teni taluk, Teni District. Tamil nadu. India by M/S Avaneetha Textiles (P) Ltd | Avaneetha Textiles (P) Ltd | India | 30 Aug 2011 |
The Capture and Utilisation of Mine Methane at the Beatrix West Shaft in South Africa | Gold Fields (Pty) Ltd | South Africa | 30 Aug 2011 |
Zhangbei Dahulun Phase II Wind Farm Project | Zhongdiantou Zhangbei Wind Power Co., Ltd. | China | 30 Aug 2011 |
Hubei Wafangping 2nd Level Hydropower Project | Fang County Yinyuhe Hydropower Development Co., Ltd | China | 29 Aug 2011 |
Biomass & Biogas based cogeneration unit in Karnataka, India | Millennium Starch India Pvt. Ltd | India | 29 Aug 2011 |
CEMEX Mexico: Biomass project at Tamuin cement plant | CEMEX México S.A de C.V | Mexico | 29 Aug 2011 |
Yunnan Dawantang 1st Level Hydropower Project. | Yongping County Dawantang Hydropower Development Co., Ltd | China | 29 Aug 2011 |
Jiangsu Huadian Dongtai Phase II Solar Power Project | Huadian Shangde Dongtai Solar Power Generation Co.,Ltd | China | 29 Aug 2011 |
Jizhong Energy Zhangjiakou Mining Group Co.,Ltd Xuandong Coalmine VAM Oxidation and Utilization Project | Jizhong Energy Zhangjiakou Minig Group Co., Ltd | China | 29 Aug 2011 |
CEMEX Mexico: Biomass project at Huichapan cement plant | CEMEX México S.A de C.V | Mexico | 29 Aug 2011 |
Fuyang MSW Landfill site LFG Recovery to power project | Shanghai BCCY New Power Industry Co., Ltd | China | 29 Aug 2011 |
Installation of Biomass based boiler | Dhawan Box Sheet Containers Pvt., Ltd. | India | 29 Aug 2011 |
Pengshui Xiamakou Hydropower Project | Chongqing Gangjiang Hydropower Investment Co., Ltd | China | 29 Aug 2011 |
La Gloria EFB + POME Co-composting Project | Extractora La Gloria S.A.S. | Colombia | 29 Aug 2011 |
Huadian Ningxia Ningdong Phase V Wind Farm Project | Huadian Ningxia Ningdong Wind Power Generation Co.,Ltd | China | 29 Aug 2011 |
1 MWp Grid Connected Solar Photo Voltaic Power Project | Andhra Pradesh Power Generation Corporation Limited | India | 27 Aug 2011 |
Grid Connected Wind Power Project by M/s. D. J. Malpani at Ratan Ka Bas (RKB) Rajasthan | M/s. D. J. Malpani | India | 26 Aug 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: