08:25 02 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4821-4840
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Zhongdiantou Kushitayi Hydropower Project | Kukesu River Hydropower Development Co., Ltd | China | 31 Oct 2011 |
Biomass based thermal energy in Uttar Pradesh, India | R R Food Products (India) Pvt. Ltd | India | 31 Oct 2011 |
Beijing Northeast Power Center Jingneng Gas-fired Cogeneration Project | Beijing Jingneng Gaoantun Gas-fired Cogeneration Co., Ltd | China | 31 Oct 2011 |
Habshan/Shah - Etihad Railway Project | Etihad Rail | United Arab Emirates | 30 Oct 2011 |
Gomali Biogas Project | GenPower Carbon Solutions Services (Malayasia) Sdn Bhd | Malaysia | 28 Oct 2011 |
Gansu Zhangye Solar Power Project | Longyuan Zhangye New Energy Development Co., Ltd | China | 28 Oct 2011 |
NSPL Biomass Thermal Energy Generation Small Scale Bundled CDM Project in Sri Lanka | Nature Solutions (Pvt) Ltd | Sri Lanka | 28 Oct 2011 |
Co-composting of organic residues in Alianza del Humea's Palm Oil Mill | Alianza del Humea S.A.S; Optim Consult S.A.S | Colombia | 28 Oct 2011 |
Shanxi Shenci Huanghuamu Wind Power Project | Shanxi Longyuan Wind Power Co Ltd | China | 28 Oct 2011 |
Capacity addition for the Lebong Hydroelectric Power Plant | PT. Mega Karsa Mandiri | Indonesia | 28 Oct 2011 |
Zhongdiantou Hami 20MW Grid-connected Solar Power Generation Project | China Power Investment Corporation Xinjiang Energy Co. Ltd | China | 28 Oct 2011 |
Danghe Upstream 3rd Cascade Hydropower Station Project | Huaneng Subei Hydropower Development Co., Ltd | China | 28 Oct 2011 |
Ladang Sabah Biogas Project | GenPower Carbon Solutions Services (Malayasia) Sdn Bhd | Malaysia | 28 Oct 2011 |
Biomass based power generation project at Ropar, Punjab by P&R Agri Energy Pvt., Ltd | P&R Agri Energy Pvt Ltd | India | 28 Oct 2011 |
Zhongdiantou Hetian 20MW Grid-connected Solar Power Generation Project | China Power Investment Corporation Xinjiang Energy Co., Ltd | China | 28 Oct 2011 |
BSE Solar Power Plant at Chaiyaphum, Thailand | Bangchak Solar Energy Co. Ltd | Thailand | 28 Oct 2011 |
Tianrong Binzhou Zhanhua Phase I Wind Farm Project | Shandong Tianrong New Energy Development Co., Ltd | China | 28 Oct 2011 |
CGN Shagou Phase I Wind Power Project | CGN Wind Energy Ltd | China | 28 Oct 2011 |
BSE Solar Power Plant at Ayutthaya, Thailand | Bangchak Solar Energy Co. Ltd | Thailand | 28 Oct 2011 |
Zhongdiantou Tulufan 20MW Grid-connected Solar Power Generation Project | China Power Investment Xinjiang Energy Co., Ltd | China | 28 Oct 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: