14:27 31 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4001-4020
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Ningxia Tongxin Datang New Energy Phase I Wind Farm Project | Datang Tongxin New Energy Co., Ltd. | China | 12 Jan 2012 |
K-water Gyeongin,Gampo Wind-Power | K-water(Korea Water Resources Corporation) | Republic of Korea | 12 Jan 2012 |
0.85 MW Wind Power Generation in Tirupur District by M/S.Centrfoid Fashions | M/S.Centrfoid Fashions | India | 12 Jan 2012 |
Guizhou Beipanjiang Mamaya 1st Stage Hydro Power Project | Guizhou Beipanjiang Electricity Co., Ltd. | China | 12 Jan 2012 |
Guizhou Pan County Sige Phase I Wind Farm Project | Datang Guiguan Pan County Sige Wind Power Co., Ltd | China | 11 Jan 2012 |
Hydroelectric Project Ituango | EPM Ituango | Colombia | 11 Jan 2012 |
Conversion from single cycle based grid connected power generation units at Erbil Gas Power Station conversion to combined cycle | Mass Iraq for Industrial Investment Company | Iraq | 11 Jan 2012 |
Chorokhi Hydro Power Plant Project | Achar Energy 2007 Ltd. Co. | Georgia | 11 Jan 2012 |
Renewable Energy Project in the state of Madhya Pradesh | Vaayu Renewable Energy (Gomti) Pvt. Ltd. | India | 11 Jan 2012 |
Qihong Yanjin Calcium Carbide Furnace Waste Heat Power Generation Project | Zhaotong Qihong Energy Co., Ltd | China | 11 Jan 2012 |
Binh Dinh Brick Project | INTRACO Co., Ltd. | Viet Nam | 11 Jan 2012 |
Guizhou Pan County Sige Phase II Wind Farm Project | Datang Guiguan Pan County Sige Wind Power Co., Ltd | China | 11 Jan 2012 |
Orosí Wind Power Project | Inversiones Eólica de Orosi Dos, S.A | Costa Rica | 11 Jan 2012 |
Co-composting of organic residues in ORO ROJO’s Palm Oil Mill at Sabana de Torres, Colombia | PROCESADORA DE ACEITE ORO ROJO LTDA.; OPTIM Consult S.A.S.; Climate Change Capital Carbon Fund II S.à.r.l. | Colombia | 11 Jan 2012 |
Wind Power Project in Gujarat, India | Vish Wind Infrastructure LLP | India | 11 Jan 2012 |
Waste Energy Recovery Power Project in the integrated steel plant in Nellore district of Andhra Pradesh | SBQ Steels Ltd | India | 11 Jan 2012 |
2.00 MW Wind Power CDM Project by M/s Livia Polymer Bottles Pvt. Ltd. | M/s. Livia Polymer Bottles Pvt. Ltd. | India | 10 Jan 2012 |
Henan Tanghe Solar Cooker Project | Sirrase Technology (Beijing) Co., Ltd. | China | 10 Jan 2012 |
Jiangxi Xinfeng County Wuyang Hydropower Station | Jiangxi Xinfeng Wuyang Industrial Co., Ltd. | China | 10 Jan 2012 |
PT. Karya Mas Energi Biogas Bundled 2 Projects | PT. Karya Mas Energi | Indonesia | 10 Jan 2012 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: