04:33 30 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
3301-3320
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
CDMA Mainstream Konstabel Solar PV Project in South Africa | South Africa Mainstream Renewable Power De Aar (Pty) Ltd | South Africa | 25 Apr 2012 |
Sichuan Mengguqiao Hydropower project | Xiaojin Zechuan Hydropower Development Co., Ltd. | China | 25 Apr 2012 |
Larsi Hydropower Plant | Energy Ltd. | Georgia | 25 Apr 2012 |
Proposed change of boiler fuel from coal to biomass or thermochemical derived products at Malalane Mill. | Tsb Sugar RSA Ltd. | South Africa | 25 Apr 2012 |
Fusong county Qingchuan 2nd Hydro Power Station Project | Fusong County Tianhe Hydropower Development Co., Ltd. | China | 24 Apr 2012 |
PCH Renic - Triton Energia LTDA | Electra Power Geração de Energia S/A | Brazil | 24 Apr 2012 |
Rio Fão Geração de Energia S/A | Electra Power Geração de Energia S/A | Brazil | 24 Apr 2012 |
Karapalagama Mini Hydro Power Project | Sierra Power (Pvt) Ltd. | Sri Lanka | 24 Apr 2012 |
Guohua Shuangliao Lianhuashan Wind Farm Second Phase Project | Guohua (Shuangliao) Wind Power Generation Co., Ltd. | China | 24 Apr 2012 |
Shuangliao Lianhuashan Wind Farm First Phase Project | Guohua (Shuangliao) Wind Power Generation Co., Ltd. | China | 24 Apr 2012 |
Wind Project Condo Conesa | Electra Power Geração de Energia S/A | Brazil | 24 Apr 2012 |
CARDEAL AMARELO GERAÇÃO DE ENERGIA S/A | Electra Power Geração de Energia S/A | Brazil | 24 Apr 2012 |
Krabi Waste to Energy Biogas Project at Aoluk | Krabi Waste to Energy Company Limited | Thailand | 24 Apr 2012 |
Santanghu Phase I 49.5MW Wind Power Project | GD Power Xinjiang New Energy Development Co., Ltd. | China | 24 Apr 2012 |
Wulatehouqi Huogeqi Windfarm First Stage 49.5MW Project | Bayannaoer Jianjizhongyan Wind Power Generation Co., Ltd. | China | 24 Apr 2012 |
Huaneng Dali Qingshuigou Wind Farm Project | Huaneng Dali Wind Power Co., Ltd. | China | 24 Apr 2012 |
Krabi Waste to Energy Biogas Project at Klongtom | Krabi Waste to Energy Company Limited | Thailand | 24 Apr 2012 |
Wind Project Cond Ventos do Paraná | Electra Power Geração de Energia S/A | Brazil | 24 Apr 2012 |
Qian’an Tengzi B Wind farm Project | Guohua (Qian'an) Wind Power Generation Co., Ltd. | China | 24 Apr 2012 |
Krabi Waste to Energy Biomass Gasification Project at Klongtom | Krabi Waste to Energy Company Limited | Thailand | 24 Apr 2012 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: