22:22 29 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
3181-3200
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Biomass based thermal energy generation by M/s Mahalaxmi Rubtech Ltd. at Sanand in Ahmedabad | M/s Mahalaxmi Rubtech Ltd. | India | 23 May 2012 |
8 MW Wind Power Plant Project at Parque Nacional Los Alerces (Los Alerces National Park) | Hidroeléctrica Futaleufú Sociedad Anónima | Argentina | 23 May 2012 |
New Energy Development Pty Ltd. Gonghe County 5MW and 20MW PV Power Generation Bundled Project | New Energy Development Pty Ltd. | China | 23 May 2012 |
Jinfeng Tianyi Dabancheng 49.5MW Shiyan Wind Farm Project | Urumqi Jinfeng Tianyi Wind Power Co., Ltd | China | 22 May 2012 |
Grid connected solar PV based power generation at Rajasthan by Symphony Vyapaar Pvt. Ltd. | Symphony Vyapaar Pvt., Ltd | India | 22 May 2012 |
Grid connected solar PVbased power generation at Rajasthan by Lexicon Vanijya Pvt. Ltd | Lexicon Vanijya Pvt. Ltd | India | 22 May 2012 |
Matas de Palma 50 MW Solar Farm in the Dominican Republic | WCG Energy Ltd | Dominican Republic | 22 May 2012 |
Biomass based Boiler project, SFI, Malaysia | Ballarpur Industries Limited (BILT) | Malaysia | 22 May 2012 |
Puebla Hydroelectric Project | Deselec 1, S de RL de CV | Mexico | 22 May 2012 |
Partial substitution of fossil fuel with biomass as an alternative fuel in pyro-processing in the cement plant at Messebo Building Materials Production P.L.C. | Messebo Building Materials Production PLC | Ethiopia | 21 May 2012 |
Solar project in Rajasthan by Sunborne Energy Rajasthan Solar Power Private Limited | Sunborne Energy Rajasthan Solar Power Private Limited | India | 21 May 2012 |
Ningxia Power Investment Lingwu Wind-farm Phase I 49.5MW Project | Ningxia Power Investment Group Lingwu Wind Power Generation Co., Ltd | China | 21 May 2012 |
Chifeng Huanggangliang 49.5MW Wind Farm Project | TEWIND New Energy Co., Ltd | China | 20 May 2012 |
Chifeng City KeshiKetengqi Laohudong 49.5MW Wind Farm Project | Maolin Wind Energy Development Co., Ltd | China | 20 May 2012 |
Wind power project at Sangli District, Maharashtra, India | Torrent Power Limited | India | 19 May 2012 |
Cogeneration Project Activity by Pravara Renewable Energy Limited | Pravara Renewable Energy Limited | India | 19 May 2012 |
Huadian Inner Mongolia Meiguiying Phase II 200MW Wind Farm Project | Inner Mongolia Huadian Meiguiying Wind Power Generation Co., Ltd. | China | 18 May 2012 |
Wulanhua Wind-farm Phase II 49.5 MW Wind Power Project | Gang Neng New Energy (Si Zi Wang Qi) Wind Power Limited | China | 18 May 2012 |
Jiangxi Daling Kuojiang Wind Farm Project | CPI Jiangxi Electric Power Co., Ltd. | China | 17 May 2012 |
Cogeneration for Electricity and Heat Production from Recovered Biogas at Tamuda WWTP | Society Amendis | Morocco | 17 May 2012 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: