06:38 29 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
2861-2880
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Zhongdiantou Hetianerqi 20MW Grid-connected Solar Photovoltaic Generation Project | China Power Investment Corporation Xinjiang Energy Hetian Co., Ltd | China | 27 Jul 2012 |
Shaanxi Fengxian Matoutan Wind Power Project | Longyuan Shaanxi Wind Power Co., Ltd | China | 27 Jul 2012 |
Gas Flaring Reduction Project at GGS, Chariali, Sibasagar, ONGC, Assam | Oil and Natural Gas Corporation Ltd | India | 27 Jul 2012 |
180 MW Red Sea State Wind Power Project | Ministry of Electricity & Dams | Sudan | 26 Jul 2012 |
Zhongdiantou Tacheng Mayitasi Phase II 49.5MW Wind Power Project | China Power Investment Corporation Xinjiang Energy Co., Ltd | China | 26 Jul 2012 |
Huaneng Dingbian Lang'ergou Distributed Wind Farm Project | Huaneng Dingbian New Energy Power Generation Co., Ltd | China | 26 Jul 2012 |
SDIC Barkol Santanghu Wind Farm First Phase 49.5 MW Wind Power Project | Arreon Carbon Trading Limited | China | 26 Jul 2012 |
Huaneng Hezhang County Shitouzhai Wind Farm Project | Huaneng Hezhang Wind Power Co., Ltd | China | 26 Jul 2012 |
Huadian Hami 40MWp Grid-connected Photovoltaic Power Project | Xinjiang Huadian Kushui Wind Power Co., Ltd | China | 26 Jul 2012 |
Grid Connected Wind Power Project in Tamilnadu by Nila Sea Foods Exports, Tuticorin | Nila Sea Foods Exports | India | 25 Jul 2012 |
Inner Mongolia Urad ZhongQi Phase II 49.5MW Wind Farm Project | Shanxi Zhangze Power Co., Ltd | China | 25 Jul 2012 |
Dak Pone 2 Hydropower Project | INTRACO Co., Ltd. | Viet Nam | 25 Jul 2012 |
Green Reforestation Initiative | Panzacrest CC Close Coporation | South Africa | 25 Jul 2012 |
NEPG Helanshan Phase VI 49.5MW Wind Farm Project | Ningxia Electric Power Group Co., Ltd | China | 25 Jul 2012 |
Waste heat recovery project based on crude oil intregrated heat treatment at Urumqi first station and Shanshan station | China Petoleum western pipeline Xinjiang branch | China | 24 Jul 2012 |
Datang Golmud Solar Power Co., Ltd Golmud Phase II 20MW PV Solar Power Generation Project | Datng Golmud Solar Power Co., Ltd | China | 24 Jul 2012 |
China petroleum western pipeline xinjiang branch heat medium heater combustion medium oil to gas project in Shanshan station | China Petroleum Western Pipeline Xinjiang Branch | China | 24 Jul 2012 |
Lijiaba Wind Farm Project in Dechang County, Liangshan Prefecture, Sichuan Province | Dechang Wind Power Development Co., Ltd | China | 24 Jul 2012 |
Kahak Wind Farm Project | MAPNA Renewable Energies Generation Company/ Rahbord Energy Design & Development Engineering Company | Iran (Islamic Republic of) | 24 Jul 2012 |
Greenhouse gas mitigation project by M/s Saradha Papers & Boards Pvt Ltd - Power Division | M/s Saradha Papers & Boards Pvt Ltd | India | 23 Jul 2012 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: