Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 125 | 126 | 127 | 128 | 129 | ... 669 >>
Displaying 2521-2540 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Helongjiang Laohugang Wind Farm Project Anda City Laohugang Wind Power Co. Ltd China 05 Dec 2012
TBEA Hongqi Farm Solar PV Power Generation Phase I Project TBEA SunOasis Co., Ltd. China 05 Dec 2012
TBEA Liushuquan Farm Solar PV Power Generation Phase I Project TBEA SunOasis Co., Ltd. China 05 Dec 2012
Leibo County Minzhu Hydropower Project Yonghe Jiaye Hydropower Investment Co., Ltd. China 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Hail Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Qassim 3 Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Faras Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Tuhama Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Installation of Supercritical Boiler from base line(Subcritical Boiler)_RasAlkhair Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Energy Efficiency Project at Majid Al Futtaim Properties Majid Al Futtaim Properties LLC United Arab Emirates 04 Dec 2012
Installation of Supercritical Boiler from base line(Subcritical Boiler)_Shuqaiq Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Installation of Supercritical Boiler from base line(Subcritical Boiler)_AlRayyis Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Wadi Dawasir Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_PP8 Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Qurayat Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Xichang Xialiu River Sanji Hydropower Project Xialiu River Electricity Development Co., Ltd. China 04 Dec 2012
Installation of Supercritical Boiler from base line(Subcritical Boiler)_Jeddah Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Rabigh V&VII Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Riyadh 9 Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Rafha 2 Saudi Electricity Company(SEC)-KSA Saudi Arabia 04 Dec 2012