12:17 28 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
2521-2540
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Helongjiang Laohugang Wind Farm Project | Anda City Laohugang Wind Power Co. Ltd | China | 05 Dec 2012 |
TBEA Hongqi Farm Solar PV Power Generation Phase I Project | TBEA SunOasis Co., Ltd. | China | 05 Dec 2012 |
TBEA Liushuquan Farm Solar PV Power Generation Phase I Project | TBEA SunOasis Co., Ltd. | China | 05 Dec 2012 |
Leibo County Minzhu Hydropower Project | Yonghe Jiaye Hydropower Investment Co., Ltd. | China | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Hail | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Qassim 3 | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Faras | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Tuhama | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Installation of Supercritical Boiler from base line(Subcritical Boiler)_RasAlkhair | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Energy Efficiency Project at Majid Al Futtaim Properties | Majid Al Futtaim Properties LLC | United Arab Emirates | 04 Dec 2012 |
Installation of Supercritical Boiler from base line(Subcritical Boiler)_Shuqaiq | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Installation of Supercritical Boiler from base line(Subcritical Boiler)_AlRayyis | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Wadi Dawasir | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_PP8 | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Qurayat | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Xichang Xialiu River Sanji Hydropower Project | Xialiu River Electricity Development Co., Ltd. | China | 04 Dec 2012 |
Installation of Supercritical Boiler from base line(Subcritical Boiler)_Jeddah | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Rabigh V&VII | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Riyadh 9 | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant_Rafha 2 | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 04 Dec 2012 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: