08:25 28 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
2441-2460
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
South Negros 18 MW BioPower Power Plant | South Negros BioPower Inc. | Philippines | 18 Jan 2013 |
Jingmen the second MSW Landfill site LFG Recovery to power project | Jingmen BCCY New Power Co.,Ltd. | China | 17 Jan 2013 |
Henan Shangcai Biomass Generation Project | National Shangcai Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
Suoi Cai Hydropower Project, Vietnam | ecotawa AG | Viet Nam | 16 Jan 2013 |
Reduction of emission through use of alternate fuels at the cement manufacturing unit in Sedam, India | Kesoram Industries Ltd. | India | 16 Jan 2013 |
Anhui Linquan Biomass Generation Project | National Linquan Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
Jilin Yushu Biomass Generation Project | National Yushu Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
"Fuel Switch based CDM Project Activity by HSPL" | HSPL | India | 16 Jan 2013 |
Sichuan Santai Biomass Generation Project | National Santai Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
Shaanxi Fuping Biomass Generation Project | National Fuping Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
Jiangxi Pengze Biomass Generation Project | National Pengze Bio Energy Co.,Ltd. | China | 16 Jan 2013 |
Pingjiang Mufushan Wind Farm Project | Pingjiang Kaidi Green Energy Development Co., Ltd. | China | 16 Jan 2013 |
Zhumadian Chutang MSW Landfill site LFG Recovery to power project | Zhumadian BCCY New Power Co.,Ltd. | China | 15 Jan 2013 |
Pasteurizadora Rica, S.A. Fossil Fuels Switch to Sustainable Biomass Project | Pasteurizadora Rica, S.A. | Dominican Republic | 15 Jan 2013 |
Yantai Runda Solid Waste Incineration and Power Generation Project | Yantai Runda Garbage Treatment Operation Co., Ltd. | China | 14 Jan 2013 |
Jiangsu Guoxin Huaian 2x180MW Class Gas-fired Cogeneration Project | Jiangsu Guoxin Huaian Natural Gas Power Co., Ltd. | China | 14 Jan 2013 |
Shandong Yongfeng New Material Technology Co., Ltd Waste Heat Recovery and Utilization for Power Generation Project | Shandong Yongfeng New Material Technology Co., Ltd | China | 14 Jan 2013 |
EL VERDE REFORESTATION/ AFFORESTATION PROJECT | PROVINCIAL GOVERNMENT OF CAMARINES SUR | Philippines | 12 Jan 2013 |
Anhui Mengcheng Biomass Generation Project | National Mengcheng Bio Energy Co., Ltd. | China | 11 Jan 2013 |
Dali Qianlingshan 40.5MW Wind Power Project | GD Power Yunnan New Energy Development Co., Ltd. | China | 10 Jan 2013 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: